asset recovery, rigging team with sling and interior demolition

Cleanroom Demolition - Preventing Particulates

Cleanroom Demolition Contractor in Laboratory

Interior and selective demolition projects involving cleanrooms are particularly sensitive when it comes to control of particulates, temperature, humidity and pressurization. R. Baker & Son is highly experienced in this form of clean demolition and recently completed a project making way for future expansion of existing cleanrooms into other parts of a facility. The project required the removal of existing office and laboratory space, as well as other support areas adjacent to existing cleanrooms.

One of the client’s top concerns during the project was preventing particulates from infiltrating the cleanrooms, so R. Baker & Son put together a plan that would cocoon the demolition area in its own negative space. Step one was to create a barrier wall between the demolition space and clean areas consisting of floor-to-ceiling metal studs lined with thick-mil plastic completely sealing the area. Existing exhaust fans in the demolition area were kept running at almost full speed with MERV 8 blue filter fabric that was checked regularly and changed as needed. A smoke test was conducted to verify the space was negative to all surrounding areas.

A temporary airlock sized for the task at hand was installed to further ensure that contaminants from non-clean areas were not brought into the demolition space. The airlock had a separate HEPA exhaust fan to create a negative chamber and was continually monitored by a magnahelic gauge to ensure negative pressure was maintained. As work proceeded, demolition debris was bagged and placed into brand new plastic tilt trucks, or trash buggies. The buggies were closed and sealed with plastic, carted into the airlock and wiped down. After disposing of the debris, the buggies were again wiped down within the airlock before reentering the demolition area. Blue sticky mats were peeled off multiple times daily.

Upon completion of demolition, the demo area was thoroughly inspected, punch listed and HEPA vacuumed clean. The space was ready for construction of new cleanrooms that would eventually be added. The client was fully satisfied with the demolition project outcome and R. Baker & Son’s performance from start to finish.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

http://rbaker.com/selective-demolition.php

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

rigging project planning, man welding steel beams
Expert Rigging: Meticulous Planning for Safe Lift Projects

A major rigging project demands meticulous planning and execution. While the actual lift may only span a day or two, it represents the culmination of weeks or even months of intense...
Rigging Equipment, skyline NYC, Women Owned Business
Efficient Rigging and Equipment Setup: Planning and Collaboration

R. Baker & Son was contacted by a large mechanical contractor with whom we have worked in the past and who works in the New Jersey-Philadelphia area. They had a large renovation project that...
Environmental Solutions for Dismantling, Decommissioning and Demolition
Eco-Friendly Solutions for Dismantling, Demo & Decommissioning

Demolition, dismantling, or decommissioning of industrial facilities is a complex process that requires meticulous planning and execution. These sites often contain hazardous chemicals, substances,...
Selective Demolition and Rigging at Process Plant
Selective Demolition and Rigging at Process Plant

R. Baker & Son recently performed selective demolition and equipment rigging for a process plant construction project. The selective demolition was necessary to prepare the existing facility to...
Chiller and Cooling Tower Installation at a South Jersey Hospital
Rigging Success: Chiller & Cooling Tower Installation at Jersey Hospital

Recently, R. Baker & Son team was faced with the task of installing a new 1200-ton chiller and double cell cooling tower at a South Jersey hospital. The project was referred to us by a trusted...
Industrial Workers Rigging 2024
Celebrating a New Year from R. Baker & Son

As a new year begins, we reflect on our deep appreciation for all our employees, associates, contractors, vendors, and customers. Our founder, Ruby Baker, started R. Baker & Son in 1935 during...
Define Demolition Scope and Budget
Maximizing Your Demolition Project - Tips to Define Scope|Budget

Often on large construction and renovation projects, the demolition portion of the Scope of Work is vague or poorly defined. It’s not uncommon to see a boxed-out area on drawings with only a...
Demolition in New York,
Industrial Demolition in NYC: A Look at the Process and Impact

When it comes to industrial demolition in NYC, R. Baker & Son has been trusted for well over 80years. With their expertise, experience, and commitment to safety, they have become one of the most...