All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Cleanroom Demolition

Cleanroom Demolition Contractor in Laboratory

Interior and selective demolition projects involving cleanrooms are particularly sensitive when it comes to control of particulates, temperature, humidity and pressurization. R. Baker & Son is highly experienced in this form of clean demolition and recently completed a project making way for future expansion of existing cleanrooms into other parts of a facility. The project required the removal of existing office and laboratory space, as well as other support areas adjacent to existing cleanrooms.

One of the client’s top concerns during the project was preventing particulates from infiltrating the cleanrooms, so R. Baker & Son put together a plan that would cocoon the demolition area in its own negative space. Step one was to create a barrier wall between the demolition space and clean areas consisting of floor-to-ceiling metal studs lined with thick-mil plastic completely sealing the area. Existing exhaust fans in the demolition area were kept running at almost full speed with MERV 8 blue filter fabric that was checked regularly and changed as needed. A smoke test was conducted to verify the space was negative to all surrounding areas.

A temporary airlock sized for the task at hand was installed to further ensure that contaminants from non-clean areas were not brought into the demolition space. The airlock had a separate HEPA exhaust fan to create a negative chamber and was continually monitored by a magnahelic gauge to ensure negative pressure was maintained. As work proceeded, demolition debris was bagged and placed into brand new plastic tilt trucks, or trash buggies. The buggies were closed and sealed with plastic, carted into the airlock and wiped down. After disposing of the debris, the buggies were again wiped down within the airlock before reentering the demolition area. Blue sticky mats were peeled off multiple times daily.

Upon completion of demolition, the demo area was thoroughly inspected, punch listed and HEPA vacuumed clean. The space was ready for construction of new cleanrooms that would eventually be added. The client was fully satisfied with the demolition project outcome and R. Baker & Son’s performance from start to finish.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

http://rbaker.com/selective-demolition.php

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

R. Baker & Son All Industrial Services Warehouse
Storing and Rigging Specialized Bio-Equipment for New Laboratory

A biomedical research firm in upstate New York reached out to R. Baker & Son for assistance with a special project. Two areas of a 40,000 square foot research building were to be phased out to...
Abandoned Industrial Building Demolition
Reuse & Value Engineering

R. Baker & Son has nearly 85 years of experience helping customers save money on projects. One approach is to reuse existing building equipment, materials, furnishings, and architectural...
450 ton energy-efficient centrifugal chillers
Rigging and Assembly on HVAC Upgrade Project

Last winter, R. Baker & Son took part in several HVAC energy upgrade projects on four air handling units ranging from 30,000 to 50,000 CFM at a Northern New Jersey hospital, as well as the...
Rigging Contractor, Crane, NY,NJ, R. Baker & Son
Fundamentals of Rigging

When it comes to crane rigging, there are a number of fundamental procedures that must be followed. R. Baker & Son is one of the nation’s top rigging contractors, with extensive knowledge...
CPR and First Aid Training Class @ R.Baker & Son
Why CPR and First Aid Training is Critical in Construction

There is no question that having employees who are trained in CPR and first aid has many benefits, first and foremost the fact that it saves lives. But CPR and first aid training can be particularly...
University Hospital NY - Renovation Project
Hospital Renovation Project

A large university hospital in New York had several buildings on campus. The central building, a 75,000 sq. ft. four-story structure with a mechanical penthouse was the first to be erected in 1944,...
Demolition Contractor: Earning & Keeping Our Reputation
Demolition Contractor: Earning and Keeping Our Great Reputation

A demolition contractor’s reputation is everything, and what can take decades to build can be lost very quickly if great care is not taken. Customers have specific overall expectations, most...
Rigging Setting the Final Pieces of Process Equipment
Rigging Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...