The Complexity of Plant Relocation Projects

The Complexity of Plant Relocation Projects

Plant relocation projects are a complex undertaking that requires professionals with years of experience and a resume of successful projects under their belt. If a complex plant relocation is done poorly it could result in runaway costs as well as lost market share, reputations and employees along the way. R. Baker & Son All Industrial Services is expert in plant relocation projects.

Plant relocation is never as simple as picking up your process in plant A and setting them down in plant B. Plant and product line moves and relocations are always much more difficult than planned or anticipated. With contractors who do their homework, know the risks upfront, have a contingency plan, and carefully manage the move, your project should be a success.

Once the decision has been made to relocate, a detailed plan must be drafted in parallel with a schedule. Important questions must be addressed: Will it be necessary to temporarily outsource plant operations? What is the critical path and non-critical path? There are very complex, intricate relationships and dependencies with plant products, equipment and utilities. Make sure the new plant can accommodate all of the operating requirements for equipment process and or products. Business interruptions are more expensive to address than physical or manufacturing process issues.

Many plant relocation projects are done in phases as most plants carry different product lines, each having their own profit centers. The relocation plan needs to address each part and phase of the relocation. Disconnecting and reconnecting to shared utilities is important and should be planned on both sides of the move from plant A to plant B.

Plant relocation project teams need to consider all risks associated with the move and how their impact can be minimized. Every project requires a contingency plan, a “what if” scenario. The quality of the move team is critical to the project’s success. Choose a highly experienced contractor plant relocation contractor like R. Baker and Son to ensure your project’s best possible outcome.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Positive Safety Habits - Industrial Rigging Equipment
Building a Safer Environment: The Power of Positive Safety Habits

Safety is contagious, much like many other human behaviors. We are naturally inclined to be influenced by positive examples set by others. When a driver buckles up, passengers often follow suit. This...
Rigging and Replacing Old Equipment - Boilers, Chilling Towers
R. Baker Seamlessly Rigging and Replacing Old Equipment

Recently, a large hospital in central New Jersey successfully completed extensive HVAC and electrical changes. These changes, which were a significant undertaking, included replacing two chillers and...
Hospital Corridor Before Demolition by R. Baker & Son
R. Baker & Son Hospital Wing Interior Demolition

R. Baker & Son was awarded a project to perform interior demolition of a 55,000 sq/ft three-story patient area in a New York hospital. The wing, erected in the early 1980s and renovated in the...
Rigging Equipment Contractor - Rigging lift in NYC
R. Baker & Son's Rigging Expertise Shines in Pharma Expansion

R. Baker & Son, an industrial tri-state contractor specializing in selective demolition and rigging services, showcased our exceptional skills during a challenging project at a high-tech...
demolition equipment at JFK NYC
R. Baker & Son Comprehensive Equipment Management Strategy

Demolition projects demand specialized equipment, machines, and tools to ensure safe and efficient execution. At R. Baker & Son, we employ an array of assets, including excavators, cranes,...
rigging project planning, man welding steel beams
Expert Rigging: Meticulous Planning for Safe Lift Projects

A major rigging project demands meticulous planning and execution. While the actual lift may only span a day or two, it represents the culmination of weeks or even months of intense...
Rigging Equipment, skyline NYC, Women Owned Business
Efficient Rigging and Equipment Setup: Planning and Collaboration

R. Baker & Son was contacted by a large mechanical contractor with whom we have worked in the past and who works in the New Jersey-Philadelphia area. They had a large renovation project that...
Environmental Solutions for Dismantling, Decommissioning and Demolition
Eco-Friendly Solutions for Dismantling, Demo & Decommissioning

Demolition, dismantling, or decommissioning of industrial facilities is a complex process that requires meticulous planning and execution. These sites often contain hazardous chemicals, substances,...