Mold Remediation on Demolition Projects

Mold Remediation on Demolition Projects

Oftentimes while performing demolition, selective demolition, dismantling, plant decommissioning or plant relocation projects, R. Baker & Son encounters mold growth.  Mold exposure can cause adverse health issues ranging from mild to very serious, so it is important that mold remediation is performed properly.  R. Baker & Son is expert in various environmental services including mold remediation. 

Mold is a fungus that requires excess moisture to grow. This moisture can be come from a variety of sources such as flooding, leaks, poor drainage, standing water, sweating pipes, inadequate dehumidification, etc. If the building is not undergoing total demolition, it is important to identify and eliminate the source of the moisture. 

Merely applying a biocide such as bleach is not enough to eliminate health threats, as mold maintains its allergenic and toxic qualities even when in a non-viable state.  Mold must be physically removed using a specifically a formulated detergent solution, or effected building materials must be completely removed from the environment.  Where mold growth is extensive, remediation must be carefully controlled to minimize health and building contamination risks.

Because mold remediation was developed using asbestos abatement practices, the two abatement methods are similar with the exception of using water to suppress airborne particles. Affected areas must be contained with plastic sheeting to prevent mold from contaminating other building areas.  Remediation workers must be equipped with proper PPE including respirator, gloves, goggles, and, at times, protective suits. Mold-contaminated materials should be removed in large pieces where possible to avoid aerosolizing mold spores, then sealed in heavy polyethylene bags or sheeting.  After a settlement, remediation workers should clean the area with HEPA vacuums and damp-wiping with a bleach solution.  Air ducts, ventilation systems, and air handling units should be evaluated and remediated as well. 

When mold is encountered on any type of project, R. Baker & Son personnel are 100% OSHA safety trained and equipped to handle mold remediation, as well as many other environmental services.  Please contact us at 732-222-3553 to discuss your needs. 

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
732-222-3553
http://www.rbaker.com

 

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Cooling Tower Dismantling Project
University Cooling Tower Dismantling Project

A large Staten Island mechanical contractor contacted R. Baker & Son to remove a 1,000-ton cooling tower at a university to make way for a new high-efficiency tower and filtration system. The...
Danger sign for rigging, dismantling & demolition site
Rigging, Dismantling & Demolition Project Safety

Safety is the number one priority on every R. Baker & Son project, from dismantling, rigging, and demolition, to plant decommissioning, plant relocation, and environmental services. Safeguards...
construction worker performing a multi heat exchanger changeout 
Baker Performs Multi Heat Exchanger Changeout

Back in early 2021, R. Baker & Son took part in a food manufacturing construction project in which we performed rigging and assembly of six large, high-pressure steam ovens over a ten-week...
Pre-construction, tablet on table of demolition contractor.
Preconstruction Services

The goal on every construction, renovation or demolition project is to have experienced, reputable contractors bid the project competitively. Preconstruction services, often referred to as precon,...
Asset Recovery: Refurbished Parts and Equipment in High Demand
Asset Recovery: Refurbished Parts and Equipment in High Demand

With supply chain shortages and inflation continuing into 2022, the demand for reconditioned parts and equipment is on the rise. Investment recovery, also known as asset recovery, of aged equipment...
Generator Replacement
Weekend Standby Generator Replacement

A large laboratory and office complex needed to replace an existing standby generator with a new, larger 2000 kW unit with associated automatic transfer switches and day tank. The owner needed the...
Rigging Project - Mechanical Room and Equipment
R. Baker & Son: Rigging Project Consultation

A longtime R. Baker & Son client approached us to help out on a very large project that was being proposed by one of the construction company’s satellite offices in Virginia. The project...
Interior Demolition: Epoxy Floor Removal Project
Interior Demolition: Epoxy Floor Removal

R. Baker & Son was contracted to perform interior demolition at a New Jersey pharmaceuticals manufacturing plant. Originally built in 1948, the second floor of the two-story building had served...