asset recovery, rigging team with sling and interior demolition

New York City Demolition Waste

New York City Demolition Waste

New York City generates over 14 tons of waste, and construction and demolition (C&D) waste accounts for more than 60%. C&D waste is defined as uncontaminated solid waste.  C&D abatement operations are regulated by the Department of Buildings (DOB), the Department of Environmental Protection (DEP), and the Fire Department of New York (FDNY).  Depending on the nature of a demolition project, permits must be issued by one or any combination of the three agencies. 

Though New York City strictly enforces disposition of construction and demolition debris, it encourages but does not require recycling of C&D waste. R. Baker & Son is wholly committed to reuse and recycling of demolition debris to ease environmental impact, conserve natural resources, and save energy. Demolition waste materials that are currently recycled include asphalt, brick, corrugated cardboard, carpet, concrete, drywall, film plastic, fluorescent lamps, glass, land clearing debris, metal, pallets, roofing, and wood. Renovation, demolition and dismantling projects may also yield salvageable materials that can be reused, such as appliances, architectural features, circuit breakers, office furniture, windows and doors, and wood timbers.  Certain solid waste cannot be categorized as construction and demolition debris.  This can include asbestos, fluorescent lights, carpeting, etc. 

Currently, there are eighty regulated construction and demolition waste processing facilities in New York State, and 280 registered C&D waste processing facilities.  Registered facilities process wood, concrete, masonry, steel, asphalt, brick, soil, and rock that are uncontaminated. In 2010 these facilities processed 11.5 million tons of construction and demolition debris and recovered about 6.3 million tons of material. 

As part of our commitment to divert construction and demolition debris from landfills and incineration facilities, R. Baker & Son is 100% LEED compliant and ensures that clients receive all LEED rating points (up to 14 points) available in our portion of a project.  Recycling and/or salvage of C&D debris can earn 1-2 LEED points.  Diversion of 50% of demolition waste is worth 1 point, and 75% earns 2 points. Non-LEED projects may also qualify for LEED points if construction and demolition debris is appropriately recycled or salvaged. 

R. Baker & Son All Industrial Services

1 Globe Court

Red Bank, NJ 07701

Phone: 732-222-3553

Fax: 732-450-031
Follow Us On Facebook

 

Full News Archive

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Interior Demo - Making Way For New Manufacturing Facility
Interior Demo - Making Way For New Manufacturing Facility

R. Baker & Son was recently contracted to provide interior demolition services for a new client that had just purchased a 95,000 square-foot rubber tire tread factory. With plans to construct a...
Zero Punch List - Demolition
Zero Punch List - Demolition

Unless its performed by a highly experienced and professional contractor like R. Baker & Son, demolition can be a messy, chaotic process. Demolition experience dictates the best tools, equipment,...
Process Tank Repair Project, R. Baker & Son
R. Baker & Son Process Tank Repair Project

A longtime R. Baker & Son client with several large process tank farms at their New Jersey facility contacted us for assistance with tank repairs. A manufacturer supplying tank agitators needed...
Provides a Wide Range of Environmental Services, R. Baker & Son
R. Baker & Son Provides a Wide Range of Environmental Services

Included among R. Baker & Son’s core services are environmental remediation and decontamination. We boast a team of highly-trained environmental remediation personnel as well as an arsenal...
selective demolition in hospitals
Requirements of Selective Demolition in Healthcare Facilities

Some of the most challenging selective demolition jobs are renovation projects that take place in healthcare facilities, where demolition team members must be specially trained to work in sensitive...
 Plant Demolition and Demolition Contractor Services
R. Baker & Son Demo Team Completes Partial Plant Demolition

R. Baker & Son recently completed a demolition and decommissioning project at a northern New Jersey plant. The first of R. Baker & Son’s tasks was to demolish a 60’ x 30’...
Rigging and Anchoring Heavy Machinery and Equipment
Rigging and Anchoring Heavy Machinery and Equipment

An important work scope that is often overlooked on construction projects is the rigging and anchoring of equipment to concrete, steel platforms, curbs, decking, etc. Anchoring should not be an...
Completes Selective Demolition Project on Christmas Eve
Baker Completes Selective Demolition Project on Christmas Eve

Over the recent winter holiday season, R. Baker & Son was tasked with performing selective demolition at a medical manufacturing facility that produced orthopedic titanium parts and hardware....