asset recovery, rigging team with sling and interior demolition

New York City Demolition Waste

New York City Demolition Waste

New York City generates over 14 tons of waste, and construction and demolition (C&D) waste accounts for more than 60%. C&D waste is defined as uncontaminated solid waste.  C&D abatement operations are regulated by the Department of Buildings (DOB), the Department of Environmental Protection (DEP), and the Fire Department of New York (FDNY).  Depending on the nature of a demolition project, permits must be issued by one or any combination of the three agencies. 

Though New York City strictly enforces disposition of construction and demolition debris, it encourages but does not require recycling of C&D waste. R. Baker & Son is wholly committed to reuse and recycling of demolition debris to ease environmental impact, conserve natural resources, and save energy. Demolition waste materials that are currently recycled include asphalt, brick, corrugated cardboard, carpet, concrete, drywall, film plastic, fluorescent lamps, glass, land clearing debris, metal, pallets, roofing, and wood. Renovation, demolition and dismantling projects may also yield salvageable materials that can be reused, such as appliances, architectural features, circuit breakers, office furniture, windows and doors, and wood timbers.  Certain solid waste cannot be categorized as construction and demolition debris.  This can include asbestos, fluorescent lights, carpeting, etc. 

Currently, there are eighty regulated construction and demolition waste processing facilities in New York State, and 280 registered C&D waste processing facilities.  Registered facilities process wood, concrete, masonry, steel, asphalt, brick, soil, and rock that are uncontaminated. In 2010 these facilities processed 11.5 million tons of construction and demolition debris and recovered about 6.3 million tons of material. 

As part of our commitment to divert construction and demolition debris from landfills and incineration facilities, R. Baker & Son is 100% LEED compliant and ensures that clients receive all LEED rating points (up to 14 points) available in our portion of a project.  Recycling and/or salvage of C&D debris can earn 1-2 LEED points.  Diversion of 50% of demolition waste is worth 1 point, and 75% earns 2 points. Non-LEED projects may also qualify for LEED points if construction and demolition debris is appropriately recycled or salvaged. 

R. Baker & Son All Industrial Services

1 Globe Court

Red Bank, NJ 07701

Phone: 732-222-3553

Fax: 732-450-031
Follow Us On Facebook

 

Full News Archive

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Skid Steer Loader - Demolition Contractor
The Skid Steer Loader, Workhorse of the Demolition Industry

One of the most versatile machines on any construction or demolition project is the skid steer loader, a compact, rigid-framed, engine-powered machine with lift arms that can be fitted with a variety...
Rigging Tanks In Pharmaceutical Plant
Baker Handles Pharma Rigging Project with TLC

R. Baker & Son was challenged with a unique rigging project for a pharmaceutical client in northern New Jersey.The scope of work called for removal of numerous pieces of process equipment...
Clean Air, Demolition Project
Innovative Approach to Clean Air on Demo Project

A good demolition plan often takes a holistic approach to achieve common project goals. The return on investment is almost always well worth it. R. Baker & Son was challenged to perform a...
Demolition Project - Radio Communication in Construction
Proper Radio Communication on Construction Sites

Communication is key, is a popular saying that is especially fitting on a construction, rigging, or demolition job-site. Radio communication is an important tool that helps team members work more...
Demolition, Selective Demolition, Interior Demolition
Demolition and Closing the Gap

Oftentimes during selective demolition or interior demolition activities, opening up walls, ceilings, floors, shafts and pits can expose a plethora of structural problems, code issues, and other...
Rigging - Process Equipment
Rigging and Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...
Interior Demolition Contractor in the North East
Quick Mobilization on Interior Demolition Project

Late last spring, construction was about to get underway on a large new warehouse in upstate New York when the construction management firm called R. Baker & Son with an urgent request. The...
interior demolition, mechanical contractor, installing prefabricated skids
Rigging Prefab in Sequence

At the completion of the interior demolition phase of a large renovation project, the mechanical contractor approached R. Baker & Son to request their assistance with rigging and installing...