All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Dust, Noise and Vibration During Demolition

 

Demolition is usually the first phase of a renovation project, and it requires careful planning and a highly experienced contractor. But even though it is very important to the entire project schedule to complete the demolition phase on time, design drawings are often lacking in detail, and means and methods are left to the demolition contractor.

Demolition timing and logistics must be carefully coordinated with owners and facility managers to make sure that business operations and production continue smoothly, with no disruption.  R. Baker & Son has extensive experience filling in the fine details required to complete this phase swiftly, safely, and efficiently.

Dust, noise, and vibration are often major concerns and must be addressed in detail.  Dust can be alleviated by wetting surfaces, capturing particles with fog or spray, or using exhaust systems.  Noise and vibration are largely inevitable byproducts that can be annoying to workers and disruptive to productivity, so it is important to work closely with owners to carefully schedule tasks that will create dust, noise, vibration, or any combination of the three.  For example, a job requiring the use of jackhammers can be scheduled on a particular day from 6 to 8 a.m., noon to 1 p.m., and 4 to 6 p.m.  This allows management to plan ahead and work around these conditions without any surprises or unexpected disruptions.

A Rigging and Routing Plan is another important part of the demolition phase of a project.

R. Baker & Son is familiar with the many complexities involved in moving large pieces of equipment such as lyophilizers, air handling units, isolators and boilers.  Careful planning is required to determine when and how to move these items, and through what access points, and
rigging is coordinated to occur during convenient off hours when personnel safety won’t be compromised. 

R. Baker & Son has countless successful demolition projects under our belts and can provide clients with demolition schedules and Rigging & Routing Plans that address all project concerns and details.  Please contact us if we can help with your next project.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico. The Service-Disabled Veteran-Owned Small Business (SDVOSB) has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million). Capabilities include industrial and commercial demolition, rigging, machinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com

 

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Toolbox Talks, R. Baker & Son Demolition Crew
Safety Through Dialogue: The Critical Role of Toolbox Talks

Toolbox talks are a cornerstone of effective company safety programs. These informal safety meetings, typically held on job sites before work begins, focus on specific safety topics and are designed...
Safety in Construction
The Critical Importance of Safety Investment in Construction

In the construction industry, and especially our industry, investing in safety is not just a regulatory requirement—it's a strategic decision that yields numerous benefits. A comprehensive...
Demolition company discussing pricing
Understanding the Difference Between Lowest Price and Best Price

In purchasing services, particularly in contracting, it's crucial to understand that the "lowest price" rarely equates to the "best price." Smart purchasing involves looking...
R. Baker BIM Laser Scans for Demolition Project
Accelerated Project Timelines with R. Baker BIM Laser Scans

R. Baker was awarded a large demolition project in an existing 130k sq/ft laboratory facility to make way for a new modern lab facility. Our client had presented us with a very aggressive demolition...
Positive Safety Habits - Industrial Rigging Equipment
Building a Safer Environment: The Power of Positive Safety Habits

Safety is contagious, much like many other human behaviors. We are naturally inclined to be influenced by positive examples set by others. When a driver buckles up, passengers often follow suit. This...
Rigging and Replacing Old Equipment - Boilers, Chilling Towers
R. Baker Seamlessly Rigging and Replacing Old Equipment

Recently, a large hospital in central New Jersey successfully completed extensive HVAC and electrical changes. These changes, which were a significant undertaking, included replacing two chillers and...
Hospital Corridor Before Demolition by R. Baker & Son
R. Baker & Son Hospital Wing Interior Demolition

R. Baker & Son was awarded a project to perform interior demolition of a 55,000 sq/ft three-story patient area in a New York hospital. The wing, erected in the early 1980s and renovated in the...
Rigging Equipment Contractor - Rigging lift in NYC
R. Baker & Son's Rigging Expertise Shines in Pharma Expansion

R. Baker & Son, an industrial tri-state contractor specializing in selective demolition and rigging services, showcased our exceptional skills during a challenging project at a high-tech...