Experienced in Cleanroom Demolition

industrial air shower and dust removal room

Interior and selective demolition projects involving cleanrooms are particularly sensitive when it comes to controlling of particulates, temperature, humidity, and pressurization. R. Baker & Son is highly experienced in this form of clean demolition and recently completed a project making way for future expansion of existing cleanrooms into other parts of a facility. The project required the removal of existing office and laboratory space, as well as other support areas adjacent to existing cleanrooms. 

One of the client’s top concerns during the project was preventing particulates from infiltrating the cleanrooms, so R. Baker & Son put together a plan that would cocoon the demolition area in its own negative space. Step one was to create a barrier wall between the demolition space and clean areas consisting of floor-to-ceiling metal studs lined with thick-mil plastic completely sealing the area. Existing exhaust fans in the demolition area were kept running at almost full speed with MERV 8 blue filter fabric that was checked regularly and changed as needed. A smoke test was conducted to verify the space was negative to all surrounding areas. 

A temporary airlock sized for the task at hand was installed to further ensure that contaminants from non-clean areas were not brought into the demolition space. The airlock had a separate HEPA exhaust fan to create a negative chamber and was continually monitored by a magnahelic gauge to ensure negative pressure was maintained. As work proceeded, demolition debris was bagged and placed into brand new plastic tilt trucks, or trash buggies. The buggies were closed and sealed with plastic, carted into the airlock and wiped down. After disposing of the debris, the buggies were again wiped down within the airlock before reentering the demolition area. Blue sticky mats were peeled off multiple times daily. 

Upon completion of demolition, the demo area was thoroughly inspected, punch listed and HEPA vacuumed clean. The space was ready for construction of new cleanrooms that would eventually be added. The client was fully satisfied with the demolition project outcome and R. Baker & Son’s performance from start to finish.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553
http://rbaker.com/environmental.php

 

Full News Archive

2025

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

R. Baker Industrial Worker With Laptop At Demolition Project
Precision Planning in Construction Demolition

When it comes to defining a construction project's approach, most proficient project management teams can produce a plan that methodically lays out phases, tasks, and timelines in meticulous...
interior demolition at a manufacturing and production facility, rigging crew
Precision MEP Install at a South Jersey Manufacturing Facility

As part of a 150,000 sq/ft manufacturing and production facility renovation project in South Jersey, R Baker had completed the selective interior demolition work months before. This work included...
Precision Demolition Equipment
Precision Demolition: R. Baker & Son's Advanced Equipment & Techniques

When tackling the complexities of industrial demolition, you're not just swinging a wrecking ball. At R. Baker & Son, we understand that precision, safety, and efficiency are paramount....
R. Baker & Son Crane used in plant relocation
Comprehensive Guide to Plant Relocation: Planning for Success

Strategic Planning: The Foundation of Plant Relocation Plant relocation represents a complex logistical challenge where success hinges primarily on thorough planning. A comprehensive master plan...
How Virtual Reality is Changing Riggers Training
How Virtual Reality is Changing Riggers Training

Using virtual reality (VR) in training for rigging professionals offers a multitude of benefits that enhance the learning experience and improve safety and efficiency in the field. Here are some key...
Chemical Bursting: Concrete Demolition
Chemical Bursting: The Silent Revolution in Concrete Demolition

While traditional concrete demolition often relies on hydraulic breakers, pneumatic drills, saw cutting, and explosives, some projects demand more subtle approaches. Chemical bursting, also known as...
Demolition and Rigging: A Half Century of Safety Innovation
Demolition and Rigging: A Half Century of Safety Innovation

Safety stands as the cornerstone of everything we do at R Baker and Son's demolition and rigging operations. Those of us with decades of experience in the field understand the importance of...
Toolbox Talks, R. Baker & Son Demolition Crew
Safety Through Dialogue: The Critical Role of Toolbox Talks

Toolbox talks are a cornerstone of effective company safety programs. These informal safety meetings, typically held on job sites before work begins, focus on specific safety topics and are designed...