All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

R. Baker & Son: Rigging Safety Guidelines

 R. Baker & Son: Rigging Safety Guidelines

According to OSHA, a significant number of construction accidents are crane-related, and most could have been prevented with proper safety measures.  Safety is R. Baker & Son’s #1 priority, and we strictly observe proper rigging safety procedures on every lift we do, which is why we have an exemplary safety record that is second to none.

Guidelines for rigging safety:


 1. Inspect the condition of your equipment on a daily basis.  Check cables for kinks or worn or broken wires, and slings and straps for fraying or cuts.  Hooks, shackles, and pins should not be bent, and metal should not show corrosion, cracks, or excessive wear.  Any equipment showing damage, no matter how slight, must be immediately removed from service.  


 2. Know your equipment, and use it properly: equipment and accessories should be selected based on precise load size and weight analyses and calculations.  There is no room for error in rigging; if a load doesn’t meet the safe capacity, don’t make the lift.  


 3. Develop an approved pick plan where required and whenever possible.  Determine whether a tagline is necessary, especially where clearances are limited.  


 4. Check slings and connections: Before lifting, remove slack from slings and watch for sharp or jagged edges that may damage the sling.  Ensure that connection points are tight and secure.  


 5. Position cranes on stable ground and make sure the area is sufficient to accommodate the crane outriggers, and the load.  


 6. Take precautions when there are high winds, and be prepared for sudden gusts.  If winds exceed or threaten to exceed safe limits, do not make the lift.


 7. Designate team leaders and signal persons, and assign specific roles to team members taking part in the lift. 


 8. Crane operators should first lift a load a few inches to make sure it is properly balanced and secured and the equipment is functioning properly.  


 9. Loads should be moved smoothly over the planned route, with no sudden movements. When necessary, riggers use taglines to control a load and prevent spinning from a safe distance.  


R. Baker & Son’s expert team includes master riggers, professional engineers, and skilled rigging tradesman capable of handling even the most challenging and complex rigging projects.  We provide clients with a full selection of rigging services including rigging of heavy equipment and machinery, sensitive pharmaceutical and manufacturing equipment, rigging and dismantling of equipment and process lines, equipment salvage and removal, match marking, reinstallation, and millwrighting.  
 

For more information on R. Baker & Son’s rigging services, please visit our webpage rigging-contractors.php  
 

About R. Baker & Son All Industrial Services

 

R. Baker & Son All Industrial Services, a Service-Disabled Veteran-Owned Small Business (SDVOSB) in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in nearly a dozen projects achieving OSHA VPP Star status). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

 

Demolition,  wrecking and razing,  rigging, millwright, plant reconfigurations, heavy rigging, Service-Disabled Veteran-Owned Small Business / SDVOSB, salvage, dismantling, decommissioning, plant and machinery moving, building demolition, riggers, environmental services, remediation, decontamination, abatement, interior demolition, investment and asset recovery.

 

R. Baker & Son All Industrial Services

1 Globe Court

Red Bank, NJ 07701

Phone: 732-222-3553

Fax: 732-450-0311

https://www.facebook.com/Demolition.Rigging

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Cooling Tower Dismantling Project
University Cooling Tower Dismantling Project

A large Staten Island mechanical contractor contacted R. Baker & Son to remove a 1,000-ton cooling tower at a university to make way for a new high-efficiency tower and filtration system. The...
Danger sign for rigging, dismantling & demolition site
Rigging, Dismantling & Demolition Project Safety

Safety is the number one priority on every R. Baker & Son project, from dismantling, rigging, and demolition, to plant decommissioning, plant relocation, and environmental services. Safeguards...
construction worker performing a multi heat exchanger changeout 
Baker Performs Multi Heat Exchanger Changeout

Back in early 2021, R. Baker & Son took part in a food manufacturing construction project in which we performed rigging and assembly of six large, high-pressure steam ovens over a ten-week...
Pre-construction, tablet on table of demolition contractor.
Preconstruction Services

The goal on every construction, renovation or demolition project is to have experienced, reputable contractors bid the project competitively. Preconstruction services, often referred to as precon,...
Asset Recovery: Refurbished Parts and Equipment in High Demand
Asset Recovery: Refurbished Parts and Equipment in High Demand

With supply chain shortages and inflation continuing into 2022, the demand for reconditioned parts and equipment is on the rise. Investment recovery, also known as asset recovery, of aged equipment...
Generator Replacement
Weekend Standby Generator Replacement

A large laboratory and office complex needed to replace an existing standby generator with a new, larger 2000 kW unit with associated automatic transfer switches and day tank. The owner needed the...
Rigging Project - Mechanical Room and Equipment
R. Baker & Son: Rigging Project Consultation

A longtime R. Baker & Son client approached us to help out on a very large project that was being proposed by one of the construction company’s satellite offices in Virginia. The project...
Interior Demolition: Epoxy Floor Removal Project
Interior Demolition: Epoxy Floor Removal

R. Baker & Son was contracted to perform interior demolition at a New Jersey pharmaceuticals manufacturing plant. Originally built in 1948, the second floor of the two-story building had served...