All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Knowing What’s Buried in Concrete an Important Part of Demolition

Knowing What’s Buried in Concrete an Important Part of Demolition

The history of concrete goes back at least 8,000 years, and it has been used extensively in construction since the Roman Empire. Next to water, it is the second most-consumed material on earth. Consequently, millions of tons of concrete are removed from demolition sites around the world each year. Knowing what’s buried in the concrete is an important part of every demolition project.

Demolition of concrete is not a straightforward, cut-and-dried process. It is not uncommon for contractors to have embedded rebar, conduit, plumbing piping, and, occasionally, duct work in cement during construction, rather than installing them overhead. If blueprints are not available at demolition, as is often the case, demolition contractors must do some detective work to determine what is present within the walls and floors of a concrete structure. This is crucial on selective demolition projects, where damaging or severing an electrical feeder, fiber optic, or plumbing line can be dangerous and potentially catastrophic to operations.

The first step in finding piping and/or ductwork lines in concrete is to identify where they might originate, such as in mechanical rooms, shafts, and basement areas, and determine whether the line is live. If a line is to remain in-use, an MOP (method of procedure) must be developed to identify, mark, and preserve these utilities. Strick lockout/tagout practices must be followed. Paths can often be traced with a capacitive voltage sensor, or tick tester, which sends a signal through the conduit or pipe, and workers use a detector to mark the line in question. Size and depth of a line can be determined by x-raying sections of the concrete.

With over eighty years of experience in demolition, R. Baker & Son is an established expert in concrete removal. We properly identify what’s hiding within clients’ walls and floors before cutting, chopping, or coring concrete, ensuring a safe and successful outcome on every demolition project.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
732-222-3553
http://rbaker.com/selective-demolition.php

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

R. Baker & Son All Industrial Services Warehouse
Storing and Rigging Specialized Bio-Equipment for New Laboratory

A biomedical research firm in upstate New York reached out to R. Baker & Son for assistance with a special project. Two areas of a 40,000 square foot research building were to be phased out to...
Abandoned Industrial Building Demolition
Reuse & Value Engineering

R. Baker & Son has nearly 85 years of experience helping customers save money on projects. One approach is to reuse existing building equipment, materials, furnishings, and architectural...
450 ton energy-efficient centrifugal chillers
Rigging and Assembly on HVAC Upgrade Project

Last winter, R. Baker & Son took part in several HVAC energy upgrade projects on four air handling units ranging from 30,000 to 50,000 CFM at a Northern New Jersey hospital, as well as the...
Rigging Contractor, Crane, NY,NJ, R. Baker & Son
Fundamentals of Rigging

When it comes to crane rigging, there are a number of fundamental procedures that must be followed. R. Baker & Son is one of the nation’s top rigging contractors, with extensive knowledge...
CPR and First Aid Training Class @ R.Baker & Son
Why CPR and First Aid Training is Critical in Construction

There is no question that having employees who are trained in CPR and first aid has many benefits, first and foremost the fact that it saves lives. But CPR and first aid training can be particularly...
University Hospital NY - Renovation Project
Hospital Renovation Project

A large university hospital in New York had several buildings on campus. The central building, a 75,000 sq. ft. four-story structure with a mechanical penthouse was the first to be erected in 1944,...
Demolition Contractor: Earning & Keeping Our Reputation
Demolition Contractor: Earning and Keeping Our Great Reputation

A demolition contractor’s reputation is everything, and what can take decades to build can be lost very quickly if great care is not taken. Customers have specific overall expectations, most...
Rigging Setting the Final Pieces of Process Equipment
Rigging Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...