All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

BioPharm Plant Relocation in NJ Safely Completed by R. Baker & Son

R. Baker & Son All Industrial Services recently completed a challenging project for a large biopharmaceutical firm in New Jersey.  The project involved the relocation of extremely sensitive and technologically advanced biopharmaceutical equipment, utilized in cGMP-regulated environments, from multiple levels of one building to a newly constructed building across site.  The equipment was vital to production, and it was crucial that the move have minimal to no impact to plant operations.

Shortly after work on the project had begun, the leader of the user group came to the worksite to check on our progress.  He was astonished to find that we had already come and gone, the job completely finished, with all of the equipment in place and ready to run.
 
He was very impressed with R. Baker & Son’s crews and expressed his elation that his expectations had not only been met, but highly exceeded.
 
In a personal letter he wrote to our president, David Baker, he commended R. Baker & Son’s professionalism and thanked us for a job well done.  The relocation to the new building was virtually seamless, he wrote.  It was as if R. Baker & Son’s crew and equipment “weren’t even there”.
 
Thank you, sir.  We could not have asked for higher praise.

About R. Baker & Son All Industrial Services
 
R. Baker & Son All Industrial Services is the premier specialized contractor for dismantlement, decommissioning, plant relocations and demolition in the United States, Puerto Rico and Canada. The Service-Disabled Veteran-Owned Small Businesses (SDVOSB) has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) projects that have been awarded VPP OSHA site safety awards) and is financially strong (bonding over $10 Million). Capabilities include total turn-key plant and facility dismantlement, decommissioning, building demolition, onsite concrete crushing as well as heavy equipment rigging, entire plant relocations, machinery moving and millwright services.
 
Contact Information
 
R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: http://www.rbaker.com
Email: Damon Kozul, PE, CHMM at dkozul@rbaker.com

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Cooling Tower Dismantling Project
University Cooling Tower Dismantling Project

A large Staten Island mechanical contractor contacted R. Baker & Son to remove a 1,000-ton cooling tower at a university to make way for a new high-efficiency tower and filtration system. The...
Danger sign for rigging, dismantling & demolition site
Rigging, Dismantling & Demolition Project Safety

Safety is the number one priority on every R. Baker & Son project, from dismantling, rigging, and demolition, to plant decommissioning, plant relocation, and environmental services. Safeguards...
construction worker performing a multi heat exchanger changeout 
Baker Performs Multi Heat Exchanger Changeout

Back in early 2021, R. Baker & Son took part in a food manufacturing construction project in which we performed rigging and assembly of six large, high-pressure steam ovens over a ten-week...
Pre-construction, tablet on table of demolition contractor.
Preconstruction Services

The goal on every construction, renovation or demolition project is to have experienced, reputable contractors bid the project competitively. Preconstruction services, often referred to as precon,...
Asset Recovery: Refurbished Parts and Equipment in High Demand
Asset Recovery: Refurbished Parts and Equipment in High Demand

With supply chain shortages and inflation continuing into 2022, the demand for reconditioned parts and equipment is on the rise. Investment recovery, also known as asset recovery, of aged equipment...
Generator Replacement
Weekend Standby Generator Replacement

A large laboratory and office complex needed to replace an existing standby generator with a new, larger 2000 kW unit with associated automatic transfer switches and day tank. The owner needed the...
Rigging Project - Mechanical Room and Equipment
R. Baker & Son: Rigging Project Consultation

A longtime R. Baker & Son client approached us to help out on a very large project that was being proposed by one of the construction company’s satellite offices in Virginia. The project...
Interior Demolition: Epoxy Floor Removal Project
Interior Demolition: Epoxy Floor Removal

R. Baker & Son was contracted to perform interior demolition at a New Jersey pharmaceuticals manufacturing plant. Originally built in 1948, the second floor of the two-story building had served...