All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

R. Baker & Son All Industrial Helps Client Win Facility of the Year Award

R. Baker & Son All Industrial Helps Client Win Facility of the Year Award

R. Baker and Son All Industrial Services’ Efforts Contribute to Facility of the Year Award

R. Baker & Son All Industrial Services, an expert dismantlement, demolition, rigging and re-installation contractors, contributed to a global pharmaceutical company winning the Facility of the Year Award 2008 in the category of Equipment Innovation.

The Facility of the Year Awards program, sponsored by ISPE, INERPHEX, and Pharmaceutical Processing Magazine, recognizes state-of-the-art pharmaceutical manufacturing projects that utilize new and innovative technologies to enhance the delivery of a quality project, as well as reduce the cost of producing high-quality medicines.

The expansion project began by the Fortune 500 pharmaceutical company awarding R. Baker and Son All Industrial Services (R. Baker & Son) the interior demolition and equipment salvage contractor work.  The goal of this phase of the project was to perform a total interior gut out while leaving the structural members in place.  This required an immense amount of preparation, coordination and attention to safety.  After making sure all environmental concerns were addressed properly and that utilities had been disconnected or relocated, equipment salvage was commenced.  R. Baker & Son was able to help the client offset some of the costs of the project through their expertise in process equipment sales and salvage.  Once the salvaged equipment was removed and sold, the remaining interior demolition was conducted.  This included demolition of all CMU walls, removal of elevator and stairwells, removal of sheet rock walls and drop ceiling and all remaining interior non load bearing structures.  In addition, a significant portion of the first floor slab was removed along with all equipment pads on the penthouse floor.

After interior demolition services were completed, R. Baker & Son repaired all floor openings as per specifications which included new rebar and concrete.  The client then performed the necessary pre- construction tasks in preparation to receive the new equipment for the expansion project.

R. Baker & Son was then called back in to perform the next phase of work which was the reinstallation of the new equipment.  R Baker & Son was intricately involved with the detail development of the scope of work with vendor equipment shop drawings (many in German). The scope of work was to receive, rig, set and assemble/install all of the process equipment for the project. This included the new Lyopholizer, Automated fill line, process chiller, formulation isolation equipment, process air handlers, Fluid beds MP3 and MP4. Control cabinets, HMIs, various isolation chambers and complete assembly of all shipped parts from the factory acceptance tests. The shipped parts were stored in a clean area and boxes of parts numbered in the hundreds. Laser precision was needed to set equipment due to tight tolerances.  R. Baker and Son performed any necessary shimming, pressure testing, mounting, leveling, and daily protection of the new epoxy floors which could not be damaged.

R. Baker & Son was also tasked with assisting with commissioning and startup of the newly installed equipment.  The startup process was completed with ease due to all the upfront technical planning and the expert installation performed by the R. Baker & Son re-installation crews.

Despite the complexity of rigging and re-installing this delicate and very expensive process equipment, R. Baker & Son was able to safely and efficiently complete the project without damage to any of the equipment.  The project was also on-schedule and within budget.

R. Baker & Son also participated in the project’s Star Program of OSHA’s Voluntary Protection Program (VPP). As always, safety was of highest priority, and the job was completed without incident.

For more information on the project visit http://www.facilityoftheyear.org/categorywinners2008.cfm.  For more information on R. Baker & Son’s capabilities and projects completed, visit http://www.rbaker.com

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico.  The veteran founded company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million).  Capabilities include industrial and commercial demolition, riggingmachinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

R. Baker & Son All Industrial Services Warehouse
Storing and Rigging Specialized Bio-Equipment for New Laboratory

A biomedical research firm in upstate New York reached out to R. Baker & Son for assistance with a special project. Two areas of a 40,000 square foot research building were to be phased out to...
Abandoned Industrial Building Demolition
Reuse & Value Engineering

R. Baker & Son has nearly 85 years of experience helping customers save money on projects. One approach is to reuse existing building equipment, materials, furnishings, and architectural...
450 ton energy-efficient centrifugal chillers
Rigging and Assembly on HVAC Upgrade Project

Last winter, R. Baker & Son took part in several HVAC energy upgrade projects on four air handling units ranging from 30,000 to 50,000 CFM at a Northern New Jersey hospital, as well as the...
Rigging Contractor, Crane, NY,NJ, R. Baker & Son
Fundamentals of Rigging

When it comes to crane rigging, there are a number of fundamental procedures that must be followed. R. Baker & Son is one of the nation’s top rigging contractors, with extensive knowledge...
CPR and First Aid Training Class @ R.Baker & Son
Why CPR and First Aid Training is Critical in Construction

There is no question that having employees who are trained in CPR and first aid has many benefits, first and foremost the fact that it saves lives. But CPR and first aid training can be particularly...
University Hospital NY - Renovation Project
Hospital Renovation Project

A large university hospital in New York had several buildings on campus. The central building, a 75,000 sq. ft. four-story structure with a mechanical penthouse was the first to be erected in 1944,...
Demolition Contractor: Earning & Keeping Our Reputation
Demolition Contractor: Earning and Keeping Our Great Reputation

A demolition contractor’s reputation is everything, and what can take decades to build can be lost very quickly if great care is not taken. Customers have specific overall expectations, most...
Rigging Setting the Final Pieces of Process Equipment
Rigging Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...