Rigging Prefab in Sequence

interior demolition, mechanical contractor, installing prefabricated skids

At the completion of the interior demolition phase of a large renovation project, the mechanical contractor approached R. Baker & Son to request their assistance with rigging and installing prefabricated skids and pipe racks of mechanical systems and equipment. 

After first rigging and installing chillers and cooling towers, the Baker Team assisted the manufacturer of the custom air handler with the assembly of seven air handlers, each of which arrived onsite in six sections. We used a 130-ton hydraulic crane to hoist each section in sequence to a small sixth-floor opening into the penthouse, where they were transferred to the large dollies, then onto the concrete housekeeping pads for assembly. Next up were prefabricated hot water and chilled water pumping skids that included heat exchangers, valves, air separators and all other specialties; riggers carefully moved the skids to their places and set them with laser precision, thanks to extensive BIM modeling of the facility. Prefabricated piping for interconnecting the skids and air handlers was rigged into the penthouse and hoisted into place on waiting hangers, ready to be bolted together. 

Below the penthouse were five stories of office and lab spaces. Dozens of 6 ½ ft. x 20-30 ft. pipe racks housing everything from chilled water, reheat hot water, compressed air, lab gases, and even ductwork, were assembled with 1 ½ inch strut on each floor. The mechanical had each pipe rack delivered in a cascading sequence so that the end of each pipe rack could be connected to the next section, each of which arrived by dolly and was lifted to the waiting threaded rod using several Vermette 520 lifts.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Business (SDVOB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://rbaker.com/environmental.php

Full News Archive

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Rigging Project
Stainless Steel Tank Rigging Project Saved by Plan B

Progress on a construction site can sometimes be thwarted when new equipment or materials arrive with problems. Sometimes, no matter how much planning went into a project, one or two obstacles can...
Taking On Diverse Tasks on Renovation and Construction Projects
Taking On Diverse Tasks on Renovation and Construction Projects

Large renovations projects can be multi-faceted in depth and scope, and oftentimes a variety of small, unassigned tasks emerge as work progresses. Because these unexpected elements can make or break...
Rigging Operations, Winter Safety, Rigging Contractor
Crane & Rigging Operations and Safety During Winter

Winter is here, and as always, frigid temperatures, ice, and snow have the potential to create hazards that require crane and rigging personnel to take special precautions. These safeguards apply not...
Demolition Safety: Structural Shoring and Bracing, NYC
Demolition Safety: Structural Shoring and Bracing

Demolition and dismantling require trained workers with a strong grasp of physics concepts like fulcrum, shear, balance, moment, pressure, electrical and mechanical energy, weight, density, pinch...
Warehouse Demolition, NYC Emergency Service Call
Emergency Warehouse Demolition

The owner of a 25,000 square foot Brooklyn warehouse was in a serious bind. A wall and part of the roof of the recently-vacated building had unexpectedly collapsed, and the remaining walls appeared...
riggers and millwrights, lyophilizer
Rigging & Assembly Teams Install Pharma Fill Line

R. Baker & Son was contracted by a long-time client to install a large vial fill line with a Class 100 environmental tunnel with a large lyophilizer and auto-loader system. This entailed rigging...
Rigging & Building Information Modeling
Planning A Rigging Project w/ BIM

R. Baker & Son worked closely with a client and their design firm to get upfront budget pricing for rigging building and process equipment on a large process manufacturing facility project. The...
curtain wall demolition contractor NYC
Expert in NYC Curtain Wall Dismantling and Demolition

Ever since construction of the glass-clad United Nations Secretariat Building was completed in 1952, skyscrapers encased in sparkling glass curtain walls have come to dominate the New York City...