asset recovery, rigging team with sling and interior demolition

Rigging Prefab in Sequence

interior demolition, mechanical contractor, installing prefabricated skids

At the completion of the interior demolition phase of a large renovation project, the mechanical contractor approached R. Baker & Son to request their assistance with rigging and installing prefabricated skids and pipe racks of mechanical systems and equipment. 

After first rigging and installing chillers and cooling towers, the Baker Team assisted the manufacturer of the custom air handler with the assembly of seven air handlers, each of which arrived onsite in six sections. We used a 130-ton hydraulic crane to hoist each section in sequence to a small sixth-floor opening into the penthouse, where they were transferred to the large dollies, then onto the concrete housekeeping pads for assembly. Next up were prefabricated hot water and chilled water pumping skids that included heat exchangers, valves, air separators and all other specialties; riggers carefully moved the skids to their places and set them with laser precision, thanks to extensive BIM modeling of the facility. Prefabricated piping for interconnecting the skids and air handlers was rigged into the penthouse and hoisted into place on waiting hangers, ready to be bolted together. 

Below the penthouse were five stories of office and lab spaces. Dozens of 6 ½ ft. x 20-30 ft. pipe racks housing everything from chilled water, reheat hot water, compressed air, lab gases, and even ductwork, were assembled with 1 ½ inch strut on each floor. The mechanical had each pipe rack delivered in a cascading sequence so that the end of each pipe rack could be connected to the next section, each of which arrived by dolly and was lifted to the waiting threaded rod using several Vermette 520 lifts.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Business (SDVOB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

https://rbaker.com/environmental.php

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Cooling Tower Dismantling Project
University Cooling Tower Dismantling Project

A large Staten Island mechanical contractor contacted R. Baker & Son to remove a 1,000-ton cooling tower at a university to make way for a new high-efficiency tower and filtration system. The...
Danger sign for rigging, dismantling & demolition site
Rigging, Dismantling & Demolition Project Safety

Safety is the number one priority on every R. Baker & Son project, from dismantling, rigging, and demolition, to plant decommissioning, plant relocation, and environmental services. Safeguards...
construction worker performing a multi heat exchanger changeout 
Baker Performs Multi Heat Exchanger Changeout

Back in early 2021, R. Baker & Son took part in a food manufacturing construction project in which we performed rigging and assembly of six large, high-pressure steam ovens over a ten-week...
Pre-construction, tablet on table of demolition contractor.
Preconstruction Services

The goal on every construction, renovation or demolition project is to have experienced, reputable contractors bid the project competitively. Preconstruction services, often referred to as precon,...
Asset Recovery: Refurbished Parts and Equipment in High Demand
Asset Recovery: Refurbished Parts and Equipment in High Demand

With supply chain shortages and inflation continuing into 2022, the demand for reconditioned parts and equipment is on the rise. Investment recovery, also known as asset recovery, of aged equipment...
Generator Replacement
Weekend Standby Generator Replacement

A large laboratory and office complex needed to replace an existing standby generator with a new, larger 2000 kW unit with associated automatic transfer switches and day tank. The owner needed the...
Rigging Project - Mechanical Room and Equipment
R. Baker & Son: Rigging Project Consultation

A longtime R. Baker & Son client approached us to help out on a very large project that was being proposed by one of the construction company’s satellite offices in Virginia. The project...
Interior Demolition: Epoxy Floor Removal Project
Interior Demolition: Epoxy Floor Removal

R. Baker & Son was contracted to perform interior demolition at a New Jersey pharmaceuticals manufacturing plant. Originally built in 1948, the second floor of the two-story building had served...