asset recovery, rigging team with sling and interior demolition

Plant Relocation Specialists

R. Baker Plant Relocation Photo

Relocating a plant can be a complex undertaking, one that requires close coordination, meticulous planning, and good communication among contractors, owners, designers, and facility personnel. A poorly-executed plant relocation project can result in runaway costs, prolonged downtime, lost production, and a damaged repu- tation. R. Baker & Son is a long-estab- lished expert in plant relocation that can ensure a smooth and successful transition.

Before any work can begin, a plant relocation contractor must thoroughly understand the intricate web of day-to-day plant operations, including

products and method of production, plant machinery, and utilities. A detailed, multi-phased, coordinated plan is developed to seamlessly ramp down the vacating facility while simultaneously phasing in production at the new plant. Existing equipment is assessed to determine which will be relocated and reused, verifying that it meets local code at the new facility, and whether it will require modification, repair or refurbishment. 3D build- ing information modeling (BIM) of the new facility’s mechanical and structural building components is used for planning utility and equipment placement.

Equipment slated for relocation must be meticulously identified, logged, disassembled, match-marked, and readied for shipment, and utility connections and sepa- ration points must be accurately recorded. All structural modifications must be completed at the new facility to accommodate the new equipment. Necessary utility systems, including electrical substations and distribution, IT racks and switches, building automation systems, and process control systems, must be identified, designed and installed to ensure that equipment installation, testing and commissioning can occur without a hitch. In addition to relocating and installing existing equipment, a project may require purchase and installation of new equipment.

R. Baker & Son has performed hundreds of plant relocations across the globe. To find out how Baker can help you plan and successfully execute your plant relocation project, contact us at 732-222-3553.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Business (SDVOB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553

http://rbaker.com/

Full News Archive

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Skid Steer Loader - Demolition Contractor
The Skid Steer Loader, Workhorse of the Demolition Industry

One of the most versatile machines on any construction or demolition project is the skid steer loader, a compact, rigid-framed, engine-powered machine with lift arms that can be fitted with a variety...
Rigging Tanks In Pharmaceutical Plant
Baker Handles Pharma Rigging Project with TLC

R. Baker & Son was challenged with a unique rigging project for a pharmaceutical client in northern New Jersey.The scope of work called for removal of numerous pieces of process equipment...
Clean Air, Demolition Project
Innovative Approach to Clean Air on Demo Project

A good demolition plan often takes a holistic approach to achieve common project goals. The return on investment is almost always well worth it. R. Baker & Son was challenged to perform a...
Demolition Project - Radio Communication in Construction
Proper Radio Communication on Construction Sites

Communication is key, is a popular saying that is especially fitting on a construction, rigging, or demolition job-site. Radio communication is an important tool that helps team members work more...
Demolition, Selective Demolition, Interior Demolition
Demolition and Closing the Gap

Oftentimes during selective demolition or interior demolition activities, opening up walls, ceilings, floors, shafts and pits can expose a plethora of structural problems, code issues, and other...
Rigging - Process Equipment
Rigging and Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...
Interior Demolition Contractor in the North East
Quick Mobilization on Interior Demolition Project

Late last spring, construction was about to get underway on a large new warehouse in upstate New York when the construction management firm called R. Baker & Son with an urgent request. The...
interior demolition, mechanical contractor, installing prefabricated skids
Rigging Prefab in Sequence

At the completion of the interior demolition phase of a large renovation project, the mechanical contractor approached R. Baker & Son to request their assistance with rigging and installing...