All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|         
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

What is a Critical Lift - Crane and Rigging

Image of Critical Lifting

In the crane and rigging industry, a critical lift is a rigging activity in which a comprehensive plan is necessary to minimize risk of crane failure or catastrophic loss. As for the term “critical lift”, though there is no universally-accepted single definition or industry standard used for categorization, there are a number of items that are common to various agencies and rigging industry associations. OSHA characterizes the definition thusly: a critical lift is one that a) exceeds 75% of the rated capacity of the crane or derrick, or b) requires the use of more than one crane or derrick. Various other government agencies and industry associations such as NIOSH, the US Army Corps of Engineers, and the Department of Energy use their own criteria to classify a critical lift that will require development of a critical lift plan.  Following are some of the most commonly-appearing elements of a critical lift (keeping in mind that specific projects have unique conditions that should be taken into consideration): 

  • Any lift that requires more than one crane 

  • Loads exceeding 75% of a crane’s rated capacity

  • Lifting of personnel

  • Load suspension above rigging personnel

  • Loads not in view of the crane operator

  • Loads of exceptional value

  • Loads that have the potential for becoming unstable during rigging

If it is determined that a lift is to be considered critical, a detailed critical lift plan must be prepared. Following an analysis by qualified rigging personnel, a critical lift plan should include details such as size and weight of the load, equipment needed, boom length and angle, crane and boom positioning, required personnel, crane capacity, sequencing, and environmental conditions, among others.  The critical lift plan should be thoroughly reviewed with the rigging crew prior to the lift to ensure that all necessary details and required safety procedures are in place. 

R. Baker & Son, a leading rigging contractor since 1936, has conducted countless critical lifts for a vast array of clients in a variety of industries throughout the U.S., Canada and Puerto Rico. We are staffed by experienced master riggers, engineers, and skilled rigging tradespersons and equipped with all of the necessary equipment to handle even the most complex rigging projects with the highest safety standards. 

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553
http://www.rbaker.com

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Toolbox Talks, R. Baker & Son Demolition Crew
Safety Through Dialogue: The Critical Role of Toolbox Talks

Toolbox talks are a cornerstone of effective company safety programs. These informal safety meetings, typically held on job sites before work begins, focus on specific safety topics and are designed...
Safety in Construction
The Critical Importance of Safety Investment in Construction

In the construction industry, and especially our industry, investing in safety is not just a regulatory requirement—it's a strategic decision that yields numerous benefits. A comprehensive...
Demolition company discussing pricing
Understanding the Difference Between Lowest Price and Best Price

In purchasing services, particularly in contracting, it's crucial to understand that the "lowest price" rarely equates to the "best price." Smart purchasing involves looking...
R. Baker BIM Laser Scans for Demolition Project
Accelerated Project Timelines with R. Baker BIM Laser Scans

R. Baker was awarded a large demolition project in an existing 130k sq/ft laboratory facility to make way for a new modern lab facility. Our client had presented us with a very aggressive demolition...
Positive Safety Habits - Industrial Rigging Equipment
Building a Safer Environment: The Power of Positive Safety Habits

Safety is contagious, much like many other human behaviors. We are naturally inclined to be influenced by positive examples set by others. When a driver buckles up, passengers often follow suit. This...
Rigging and Replacing Old Equipment - Boilers, Chilling Towers
R. Baker Seamlessly Rigging and Replacing Old Equipment

Recently, a large hospital in central New Jersey successfully completed extensive HVAC and electrical changes. These changes, which were a significant undertaking, included replacing two chillers and...
Hospital Corridor Before Demolition by R. Baker & Son
R. Baker & Son Hospital Wing Interior Demolition

R. Baker & Son was awarded a project to perform interior demolition of a 55,000 sq/ft three-story patient area in a New York hospital. The wing, erected in the early 1980s and renovated in the...
Rigging Equipment Contractor - Rigging lift in NYC
R. Baker & Son's Rigging Expertise Shines in Pharma Expansion

R. Baker & Son, an industrial tri-state contractor specializing in selective demolition and rigging services, showcased our exceptional skills during a challenging project at a high-tech...