The Demolition Environment

The Demolition Environment

Having the proper lighting and ventilation throughout a demolition project is important to ensure safe conditions for workers and site personnel. Though often overlooked by other demolition contractors, R. Baker & Son develops and implements lighting and ventilation plans on every project we do.

Low lighting levels can a pose a significant hazard on a demolition project and can be directly connect with increased injury. Years ago, worksite lighting typically consisted of 100W incandescent lightbulbs spaced forty to fifty feet apart on stringers, and bulbs that burned out often went unchanged. Nowadays, a demolition contractor should provide sufficient lighting with high-output mercury vapor, LED, or quartz lighting with protective cages. Lighting should be at least 3W per square foot, though some areas may require more. Shafts, pits, and other dark pockets require their own lighting, rather than depending on general area lighting to illuminate them. Demolition lighting requires constant vigilance in that lighting and lighting circuits must be relocated as work progresses to keep lighting levels sufficient and fixtures in good working order for the duration of the project.

Dirt, dust, and other particulates are an inherent part of every demolition project. Ventilation can be handled either by using the existing HVAC system, or by bringing in temporary ventilation in the form of sufficiently-sized exhaust fans. Like lighting, ventilation requires constant attention to ensure that filters are clean and equipment is running and performing properly. There should be several air changes per hour at minimum, which can be determined easily by calculating the total volume of the space, but more may be required depending on the task at hand. In demolition areas adjacent to clean spaces, a flow indicator or magnehelic gauge should be used to ensure that dust does not escape.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Process Tank Repair Project, R. Baker & Son
R. Baker & Son Process Tank Repair Project

A longtime R. Baker & Son client with several large process tank farms at their New Jersey facility contacted us for assistance with tank repairs. A manufacturer supplying tank agitators needed...
Provides a Wide Range of Environmental Services, R. Baker & Son
R. Baker & Son Provides a Wide Range of Environmental Services

Included among R. Baker & Son’s core services are environmental remediation and decontamination. We boast a team of highly-trained environmental remediation personnel as well as an arsenal...
selective demolition in hospitals
Requirements of Selective Demolition in Healthcare Facilities

Some of the most challenging selective demolition jobs are renovation projects that take place in healthcare facilities, where demolition team members must be specially trained to work in sensitive...
 Plant Demolition and Demolition Contractor Services
R. Baker & Son Demo Team Completes Partial Plant Demolition

R. Baker & Son recently completed a demolition and decommissioning project at a northern New Jersey plant. The first of R. Baker & Son’s tasks was to demolish a 60’ x 30’...
Rigging and Anchoring Heavy Machinery and Equipment
Rigging and Anchoring Heavy Machinery and Equipment

An important work scope that is often overlooked on construction projects is the rigging and anchoring of equipment to concrete, steel platforms, curbs, decking, etc. Anchoring should not be an...
Completes Selective Demolition Project on Christmas Eve
Baker Completes Selective Demolition Project on Christmas Eve

Over the recent winter holiday season, R. Baker & Son was tasked with performing selective demolition at a medical manufacturing facility that produced orthopedic titanium parts and hardware....
Rigging Project Using Building Information Modeling
3D Rigging Using BIM

R. Baker & Son was recently engaged in a complex project in which we were tasked with rigging and setting numerous pieces of process equipment from more than thirty different vendors. Items...
Rigging Project
Stainless Steel Tank Rigging Project Saved by Plan B

Progress on a construction site can sometimes be thwarted when new equipment or materials arrive with problems. Sometimes, no matter how much planning went into a project, one or two obstacles can...