asset recovery, rigging team with sling and interior demolition

The Demolition Environment

The Demolition Environment

Having the proper lighting and ventilation throughout a demolition project is important to ensure safe conditions for workers and site personnel. Though often overlooked by other demolition contractors, R. Baker & Son develops and implements lighting and ventilation plans on every project we do.

Low lighting levels can a pose a significant hazard on a demolition project and can be directly connect with increased injury. Years ago, worksite lighting typically consisted of 100W incandescent lightbulbs spaced forty to fifty feet apart on stringers, and bulbs that burned out often went unchanged. Nowadays, a demolition contractor should provide sufficient lighting with high-output mercury vapor, LED, or quartz lighting with protective cages. Lighting should be at least 3W per square foot, though some areas may require more. Shafts, pits, and other dark pockets require their own lighting, rather than depending on general area lighting to illuminate them. Demolition lighting requires constant vigilance in that lighting and lighting circuits must be relocated as work progresses to keep lighting levels sufficient and fixtures in good working order for the duration of the project.

Dirt, dust, and other particulates are an inherent part of every demolition project. Ventilation can be handled either by using the existing HVAC system, or by bringing in temporary ventilation in the form of sufficiently-sized exhaust fans. Like lighting, ventilation requires constant attention to ensure that filters are clean and equipment is running and performing properly. There should be several air changes per hour at minimum, which can be determined easily by calculating the total volume of the space, but more may be required depending on the task at hand. In demolition areas adjacent to clean spaces, a flow indicator or magnehelic gauge should be used to ensure that dust does not escape.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Cooling Tower Dismantling Project
University Cooling Tower Dismantling Project

A large Staten Island mechanical contractor contacted R. Baker & Son to remove a 1,000-ton cooling tower at a university to make way for a new high-efficiency tower and filtration system. The...
Danger sign for rigging, dismantling & demolition site
Rigging, Dismantling & Demolition Project Safety

Safety is the number one priority on every R. Baker & Son project, from dismantling, rigging, and demolition, to plant decommissioning, plant relocation, and environmental services. Safeguards...
construction worker performing a multi heat exchanger changeout 
Baker Performs Multi Heat Exchanger Changeout

Back in early 2021, R. Baker & Son took part in a food manufacturing construction project in which we performed rigging and assembly of six large, high-pressure steam ovens over a ten-week...
Pre-construction, tablet on table of demolition contractor.
Preconstruction Services

The goal on every construction, renovation or demolition project is to have experienced, reputable contractors bid the project competitively. Preconstruction services, often referred to as precon,...
Asset Recovery: Refurbished Parts and Equipment in High Demand
Asset Recovery: Refurbished Parts and Equipment in High Demand

With supply chain shortages and inflation continuing into 2022, the demand for reconditioned parts and equipment is on the rise. Investment recovery, also known as asset recovery, of aged equipment...
Generator Replacement
Weekend Standby Generator Replacement

A large laboratory and office complex needed to replace an existing standby generator with a new, larger 2000 kW unit with associated automatic transfer switches and day tank. The owner needed the...
Rigging Project - Mechanical Room and Equipment
R. Baker & Son: Rigging Project Consultation

A longtime R. Baker & Son client approached us to help out on a very large project that was being proposed by one of the construction company’s satellite offices in Virginia. The project...
Interior Demolition: Epoxy Floor Removal Project
Interior Demolition: Epoxy Floor Removal

R. Baker & Son was contracted to perform interior demolition at a New Jersey pharmaceuticals manufacturing plant. Originally built in 1948, the second floor of the two-story building had served...