Demo Project Bid Leveling Sheets: What is Included and Excluded Can Make All the

Demo Project Bid Leveling Sheets: What is Included and Excluded Can Make All the

One of the keys to a successful demolition or selective demolition project outcome is the development and use of a checklist during the bidding process known as the leveling sheet. The leveling sheet defines the scope of the project in minute detail, spelling out exactly what is included or excluded in each demolition contractor’s proposal and effectively leveling the bids for a fair comparison. Without a leveling sheet, items can go unidentified, leading to an array of problems, change orders, delays, finger-pointing, and all-around hard feelings between client and contractor.

Leveling sheet specifications on a demolition project might include:

Will demolition equipment used be battery operated or diesel?

Environmental hazards such as asbestos, lead paint, or old tanks – will they be remediated, and how?

Is the project union or non-union, and what are the working hours? Will there be second and third shifts?

Will dust and vibration be limited to specific hours?

Asset recovery – are there items of value such as copper wire or salvageable equipment that can offset project costs?

Will the demolition contractor use subcontractors to perform electrical, plumbing or mechanical aspects of their project?

Does the demolition project include specific safety items such as ISNetworld, VPPP, HAZWOPER, etc.?

Using a leveling sheet to identify what is included or excluded on any demolition or select demolition project can ensure that equipment and services are purchased wholesale from the outset, not at retail prices after the fact. Doing your homework can save a lot of money and streamline your demolition project.

R. Baker & Son - All Industrial Service
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Taking On Diverse Tasks on Renovation and Construction Projects
Taking On Diverse Tasks on Renovation and Construction Projects

Large renovations projects can be multi-faceted in depth and scope, and oftentimes a variety of small, unassigned tasks emerge as work progresses. Because these unexpected elements can make or break...
Rigging Operations, Winter Safety, Rigging Contractor
Crane & Rigging Operations and Safety During Winter

Winter is here, and as always, frigid temperatures, ice, and snow have the potential to create hazards that require crane and rigging personnel to take special precautions. These safeguards apply not...
Demolition Safety: Structural Shoring and Bracing, NYC
Demolition Safety: Structural Shoring and Bracing

Demolition and dismantling require trained workers with a strong grasp of physics concepts like fulcrum, shear, balance, moment, pressure, electrical and mechanical energy, weight, density, pinch...
Warehouse Demolition, NYC Emergency Service Call
Emergency Warehouse Demolition

The owner of a 25,000 square foot Brooklyn warehouse was in a serious bind. A wall and part of the roof of the recently-vacated building had unexpectedly collapsed, and the remaining walls appeared...
riggers and millwrights, lyophilizer
Rigging & Assembly Teams Install Pharma Fill Line

R. Baker & Son was contracted by a long-time client to install a large vial fill line with a Class 100 environmental tunnel with a large lyophilizer and auto-loader system. This entailed rigging...
Rigging & Building Information Modeling
Planning A Rigging Project w/ BIM

R. Baker & Son worked closely with a client and their design firm to get upfront budget pricing for rigging building and process equipment on a large process manufacturing facility project. The...
curtain wall demolition contractor NYC
Expert in NYC Curtain Wall Dismantling and Demolition

Ever since construction of the glass-clad United Nations Secretariat Building was completed in 1952, skyscrapers encased in sparkling glass curtain walls have come to dominate the New York City...
Interior Demolition - Wet Saw
Interior Demo: Mid-Project Changes Save Time and Money

Discovering an opportunity for substantial cost savings during a project in progress is always a welcome surprise, which was the case on a warehouse renovation in which R. Baker & Son was tasked...