Aerial Rigging

Aerial Rigging

When the use of perimeter cranes is not feasible for moving heavy materials and equipment due to inaccessibility or economic concerns, helicopter rigging can be an effective alternative.

Aerial lifts require highly-trained and experienced personnel, thorough rigging and flights plans, and extremely careful preparation. It is critical to determine the load’s precise weight, size, shape, and orientation. Risk assessments must be performed to identify hazards such as power lines, structures and cranes, and loose materials and structures in the landing or staging area. Flight permissions must be obtained from the FAA and other authorities.

Different helicopters are designed for different payload sizes, and the Erickson S-64 Aircrane, with a maximum hook weight of 25,000 lbs, has the largest capacity. The S-64 has a unique design that features an aft-facing pilot station, allowing full control of the aircraft while giving the aft pilot an unobstructed view and load placement to within millimeter tolerances. An anti-rotation rigging system prevents external loads from twisting or swinging from rotor wash. In addition to heavy-lift construction, uses for the S-64 include firefighting, disaster response, and timber harvesting.

R. Baker & Son has been involved in numerous helicopter rigging projects. With in-house master riggers, professional engineers, skilled rigging tradesmen, and state-of-the-art equipment, the Baker team is equipped to handle the most challenging or complex rigging project with utmost attention to safety.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
732-222-3553
http://www.rbaker.com

 

Full News Archive

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

construction worker performing a multi heat exchanger changeout 
Baker Performs Multi Heat Exchanger Changeout

Back in early 2021, R. Baker & Son took part in a food manufacturing construction project in which we performed rigging and assembly of six large, high-pressure steam ovens over a ten-week...
Pre-construction, tablet on table of demolition contractor.
Preconstruction Services

The goal on every construction, renovation or demolition project is to have experienced, reputable contractors bid the project competitively. Preconstruction services, often referred to as precon,...
Asset Recovery: Refurbished Parts and Equipment in High Demand
Asset Recovery: Refurbished Parts and Equipment in High Demand

With supply chain shortages and inflation continuing into 2022, the demand for reconditioned parts and equipment is on the rise. Investment recovery, also known as asset recovery, of aged equipment...
Generator Replacement
Weekend Standby Generator Replacement

A large laboratory and office complex needed to replace an existing standby generator with a new, larger 2000 kW unit with associated automatic transfer switches and day tank. The owner needed the...
Rigging Project - Mechanical Room and Equipment
R. Baker & Son: Rigging Project Consultation

A longtime R. Baker & Son client approached us to help out on a very large project that was being proposed by one of the construction company’s satellite offices in Virginia. The project...
Interior Demolition: Epoxy Floor Removal Project
Interior Demolition: Epoxy Floor Removal

R. Baker & Son was contracted to perform interior demolition at a New Jersey pharmaceuticals manufacturing plant. Originally built in 1948, the second floor of the two-story building had served...
Plant Demolition Project - Safety - Process Equipment
Pilot Plant Demolition Project

During a plant consolidation project, a three-story, 39,000 sq. ft. chemical pilot plant required demolition to make way for a future Butler storage building. R. Baker & Son worked closely with...
Decommissioning & Dismantling of HVAC Equipment - Pharma
Decommissioning and Dismantling of HVAC Equipment - Pharma

A 55,000 sq. ft. pharmaceutical facility in New Jersey was slated to undergo demolition. The 60-year-old building had undergone previous renovations over the years during which obsolete HVAC...