asset recovery, rigging team with sling and interior demolition

Dismantling Electrical Systems

Dismantling Electrical Systems

Dismantling electrical systems requires extra precaution than many other systems. 

Before a project can begin, a contractor must first identify what must be dismantled. Oftentimes in older facilities, electrical panels, motor control centers, and substations are not labeled properly, or are not labeled at all. It is important to avoid accidentally shutting off circuits that should not be turned off. Sometime this requires tracing circuits out and identifying what they feed before they can be turned off. 

Proper lockout/tag out procedures must be followed when dismantling electrical systems. This includes logging and tagging the circuits out, then identifying that the circuit is off using a voltmeter. For transformers, substations, and all electrical gear, it is recommended that the gear be grounded so as to dissipate any potential energy. Sometimes, a potential difference or charge can exist in transformers capacitors, or other equipment. This should only be done by a licensed electrician to verify that no potential energy exists. Conduit and gear that is safe and ready for removal should then be identified with green spray paint.   

Dismantling electrical gear often requires unbolting or cutting gear into pieces. Clients may wish to harvest particular parts in older equipment to set aside for spare parts, so this should be verified with the customer before commencing removal. When dismantling electrical conduit and boxes, all straps and supports must be removed, and it is important to plug existing openings from junction boxes and gear to national code requirement.  Bolts, screws, and ground rods should be removed from equipment pads, as well. Where present, oil must be removed from transformers and properly disposed of. 

Electrical dismantling is not for beginners and should be left to seasoned professionals like R. Baker & Son. With eight decades of extensive experience under our belts, RB&S is your #1 choice in demolition, rigging and dismantling.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Small Business (SDVOSB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Facebook:  https://www.facebook.com/Demolition.Rigging

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Environmental Solutions for Dismantling, Decommissioning and Demolition
Eco-Friendly Solutions for Dismantling, Demo & Decommissioning

Demolition, dismantling, or decommissioning of industrial facilities is a complex process that requires meticulous planning and execution. These sites often contain hazardous chemicals, substances,...
Selective Demolition and Rigging at Process Plant
Selective Demolition and Rigging at Process Plant

R. Baker & Son recently performed selective demolition and equipment rigging for a process plant construction project. The selective demolition was necessary to prepare the existing facility to...
Chiller and Cooling Tower Installation at a South Jersey Hospital
Rigging Success: Chiller & Cooling Tower Installation at a South Jersey Hospital

Recently, R. Baker & Son team was faced with the task of installing a new 1200-ton chiller and double cell cooling tower at a South Jersey hospital. The project was referred to us by a trusted...
Industrial Workers Rigging 2024
Celebrating a New Year from R. Baker & Son

As a new year begins, we reflect on our deep appreciation for all our employees, associates, contractors, vendors, and customers. Our founder, Ruby Baker, started R. Baker & Son in 1935 during...
Define Demolition Scope and Budget
Maximizing Your Demolition Project - Tips to Define Scope|Budget

Often on large construction and renovation projects, the demolition portion of the Scope of Work is vague or poorly defined. It’s not uncommon to see a boxed-out area on drawings with only a...
Machine skates and heavy load movement - Rigger
Rigger's Guide to Machine Skates - Role in Heavy Load Movement

In the realm of rigging, machine skates, also known as moving skates, roller skids, or dollies, have been used in one form or another throughout history. In their various forms, these devices are...
excavator at demolition site, questions about demolition contracting
Seven Key Questions Clients Want to Know About Demolition

When it comes to demolition projects, ranging from total building teardowns to selective demolition and everything in between, clients are faced with the challenge of finding the right demolition...
Interior Demolition Project - School Converted to Residential Units
Interior Demo of Old School for Conversion to Residential Units

An architect that R. Baker & Son has collaborated with reached out to us with a special interior demolition opportunity in South Jersey. The project held sentimental value for her as it involved...