Dismantling electrical systems requires extra precaution than many other systems. 

Before a project can begin, a contractor must first identify what must be dismantled.Oftentimes in older facilities, electrical panels, motor control centers, and substations are not labeled properly, or are not labeled at all. It is important to avoid accidentally shutting off circuits that should not be turned off. Sometime this requires tracing circuits out and identifying what they feed before they can be turned off. 

Proper lockout/tag out procedures must be followed when dismantling electrical systems. This includes logging and tagging the circuits out, then identifying that the circuit is off using a voltmeter. For transformers, substations, and all electrical gear, it is recommended that the gear be grounded so as to dissipate any potential energy. Sometimes, a potential difference or charge can exist in transformers capacitors, or other equipment. This should only be done by a licensed electrician to verify that no potential energy exists. Conduit and gear that is safe and ready for removal should then be identified with green spray paint.   

Dismantling electrical gear often requires unbolting or cutting gear into pieces. Clients may wish to harvest particular parts in older equipment to set aside for spare parts, so this should be verified with the customer before commencing removal. When dismantling electrical conduit and boxes, all straps and supports must be removed, and it is important to plug existing openings from junction boxes and gear to national code requirement.  Bolts, screws, and ground rods should be removed from equipment pads, as well. Where present, oil must be removed from transformers and properly disposed of. 

Electrical dismantling is not for beginners and should be left to seasoned professionals like R. Baker & Son. With eight decades of extensive experience under our belts, RB&S is your #1 choice in demolition, rigging and dismantling.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Small Business (SDVOSB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Facebook:  https://www.facebook.com/Demolition.Rigging

Full News Archive

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Skid Steer Loader - Demolition Contractor
The Skid Steer Loader, Workhorse of the Demolition Industry

One of the most versatile machines on any construction or demolition project is the skid steer loader, a compact, rigid-framed, engine-powered machine with lift arms that can be fitted with a variety...
Rigging Tanks In Pharmaceutical Plant
Baker Handles Pharma Rigging Project with TLC

R. Baker & Son was challenged with a unique rigging project for a pharmaceutical client in northern New Jersey.The scope of work called for removal of numerous pieces of process equipment...
Clean Air, Demolition Project
Innovative Approach to Clean Air on Demo Project

A good demolition plan often takes a holistic approach to achieve common project goals. The return on investment is almost always well worth it. R. Baker & Son was challenged to perform a...
Demolition Project - Radio Communication in Construction
Proper Radio Communication on Construction Sites

Communication is key, is a popular saying that is especially fitting on a construction, rigging, or demolition job-site. Radio communication is an important tool that helps team members work more...
Demolition, Selective Demolition, Interior Demolition
Demolition and Closing the Gap

Oftentimes during selective demolition or interior demolition activities, opening up walls, ceilings, floors, shafts and pits can expose a plethora of structural problems, code issues, and other...
Rigging - Process Equipment
Rigging and Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...
Interior Demolition Contractor in the North East
Quick Mobilization on Interior Demolition Project

Late last spring, construction was about to get underway on a large new warehouse in upstate New York when the construction management firm called R. Baker & Son with an urgent request. The...
interior demolition, mechanical contractor, installing prefabricated skids
Rigging Prefab in Sequence

At the completion of the interior demolition phase of a large renovation project, the mechanical contractor approached R. Baker & Son to request their assistance with rigging and installing...