All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
 
All Industrial Services Inc. of New Jersey| 190 Boundary Rd, Marlboro, NJ 07746
quote@rbaker.com| 732-222-3553|            
190 Boundary Rd, Marlboro, NJ 07746 732-222-3553
asset recovery, rigging team with sling and interior demolition

Riggers and Millwrights

Riggers and Millwrights

Top rigging, dismantling and demolition contractors like R. Baker & Son rely on the extensive knowledge, skill, and experience of riggers and millwrights.  So what, exactly, are millwrights and riggers, and what do they do? 

Millwright:
A millwright is a tradesperson who installs, maintains and repairs stationary industrial machinery and mechanical equipment by interpreting blueprints and schematics, constructing foundations, performing layouts, and assembling parts to perfect working order. Millwrights must possess a combination of skills and knowledge that includes steel fabrication, welding, machining, electronics, and fluid mechanics. They are trained through apprenticeship programs that combine classroom education with on-the-job training.  Most apprenticeships last four years and may include an Associate degree. 

Rigger:
A journeyman rigger is a tradesperson who specializes in lifting, moving, and placing extremely large or heavy loads, machinery, and objects using specialized equipment.  Riggers are responsible for staging loads and determining their sizes and weights; building or assembling jibs, derricks, cranes, booms, and other components; setting up rigging gear, cables, pulleys, and other tackle; erecting structural steel and concrete panels, etc.; and maintaining rigging equipment.  Rigging is learned through apprenticeship. 

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Service-Disabled Veteran-Owned Small Business (SDVOSB) in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery..

Demolition, wrecking and razing, rigging, millwright, plant reconfigurations, heavy rigging, Service-Disabled Veteran-Owned Small Business / SDVOSB, salvage, dismantling, decommissioning, plant and machinery moving, building demolition, riggers, environmental services, remediation, decontamination, abatement, interior demolition, investment and asset recovery.

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Facebook: https://www.facebook.com/Demolition.Rigging
 

Full News Archive

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

selective demolition in hospitals
Requirements of Selective Demolition in Healthcare Facilities

Some of the most challenging selective demolition jobs are renovation projects that take place in healthcare facilities, where demolition team members must be specially trained to work in sensitive...
 Plant Demolition and Demolition Contractor Services
R. Baker & Son Demo Team Completes Partial Plant Demolition

R. Baker & Son recently completed a demolition and decommissioning project at a northern New Jersey plant. The first of R. Baker & Son’s tasks was to demolish a 60’ x 30’...
Rigging and Anchoring Heavy Machinery and Equipment
Rigging and Anchoring Heavy Machinery and Equipment

An important work scope that is often overlooked on construction projects is the rigging and anchoring of equipment to concrete, steel platforms, curbs, decking, etc. Anchoring should not be an...
Completes Selective Demolition Project on Christmas Eve
Baker Completes Selective Demolition Project on Christmas Eve

Over the recent winter holiday season, R. Baker & Son was tasked with performing selective demolition at a medical manufacturing facility that produced orthopedic titanium parts and hardware....
Rigging Project Using Building Information Modeling
3D Rigging Using BIM

R. Baker & Son was recently engaged in a complex project in which we were tasked with rigging and setting numerous pieces of process equipment from more than thirty different vendors. Items...
Rigging Project
Stainless Steel Tank Rigging Project Saved by Plan B

Progress on a construction site can sometimes be thwarted when new equipment or materials arrive with problems. Sometimes, no matter how much planning went into a project, one or two obstacles can...
Taking On Diverse Tasks on Renovation and Construction Projects
Taking On Diverse Tasks on Renovation and Construction Projects

Large renovation projects can be multi-faceted in depth and scope, and oftentimes a variety of small, unassigned tasks emerge as work progresses. Because these unexpected elements can make or break a...
Rigging Operations, Winter Safety, Rigging Contractor
Crane & Rigging Operations and Safety During Winter

Winter is here, and as always, frigid temperatures, ice, and snow have the potential to create hazards that require crane and rigging personnel to take special precautions. These safeguards apply not...