Dust, Noise and Vibration During Demolition

 

Demolition is usually the first phase of a renovation project, and it requires careful planning and a highly experienced contractor. But even though it is very important to the entire project schedule to complete the demolition phase on time, design drawings are often lacking in detail, and means and methods are left to the demolition contractor.

Demolition timing and logistics must be carefully coordinated with owners and facility managers to make sure that business operations and production continue smoothly, with no disruption.  R. Baker & Son has extensive experience filling in the fine details required to complete this phase swiftly, safely, and efficiently.

Dust, noise, and vibration are often major concerns and must be addressed in detail.  Dust can be alleviated by wetting surfaces, capturing particles with fog or spray, or using exhaust systems.  Noise and vibration are largely inevitable byproducts that can be annoying to workers and disruptive to productivity, so it is important to work closely with owners to carefully schedule tasks that will create dust, noise, vibration, or any combination of the three.  For example, a job requiring the use of jackhammers can be scheduled on a particular day from 6 to 8 a.m., noon to 1 p.m., and 4 to 6 p.m.  This allows management to plan ahead and work around these conditions without any surprises or unexpected disruptions.

A Rigging and Routing Plan is another important part of the demolition phase of a project.

R. Baker & Son is familiar with the many complexities involved in moving large pieces of equipment such as lyophilizers, air handling units, isolators and boilers.  Careful planning is required to determine when and how to move these items, and through what access points, and
rigging is coordinated to occur during convenient off hours when personnel safety won’t be compromised. 

R. Baker & Son has countless successful demolition projects under our belts and can provide clients with demolition schedules and Rigging & Routing Plans that address all project concerns and details.  Please contact us if we can help with your next project.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico. The Service-Disabled Veteran-Owned Small Business (SDVOSB) has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million). Capabilities include industrial and commercial demolition, rigging, machinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com

 

Full News Archive

2024

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Environmental Solutions for Dismantling, Decommissioning and Demolition
Eco-Friendly Solutions for Dismantling, Demo & Decommissioning

Demolition, dismantling, or decommissioning of industrial facilities is a complex process that requires meticulous planning and execution. These sites often contain hazardous chemicals, substances,...
Selective Demolition and Rigging at Process Plant
Selective Demolition and Rigging at Process Plant

R. Baker & Son recently performed selective demolition and equipment rigging for a process plant construction project. The selective demolition was necessary to prepare the existing facility to...
Chiller and Cooling Tower Installation at a South Jersey Hospital
Rigging Success: Chiller & Cooling Tower Installation at a South Jersey Hospital

Recently, R. Baker & Son team was faced with the task of installing a new 1200-ton chiller and double cell cooling tower at a South Jersey hospital. The project was referred to us by a trusted...
Industrial Workers Rigging 2024
Celebrating a New Year from R. Baker & Son

As a new year begins, we reflect on our deep appreciation for all our employees, associates, contractors, vendors, and customers. Our founder, Ruby Baker, started R. Baker & Son in 1935 during...
Define Demolition Scope and Budget
Maximizing Your Demolition Project - Tips to Define Scope|Budget

Often on large construction and renovation projects, the demolition portion of the Scope of Work is vague or poorly defined. It’s not uncommon to see a boxed-out area on drawings with only a...
Machine skates and heavy load movement - Rigger
Rigger's Guide to Machine Skates - Role in Heavy Load Movement

In the realm of rigging, machine skates, also known as moving skates, roller skids, or dollies, have been used in one form or another throughout history. In their various forms, these devices are...
excavator at demolition site, questions about demolition contracting
Seven Key Questions Clients Want to Know About Demolition

When it comes to demolition projects, ranging from total building teardowns to selective demolition and everything in between, clients are faced with the challenge of finding the right demolition...
Interior Demolition Project - School Converted to Residential Units
Interior Demo of Old School for Conversion to Residential Units

An architect that R. Baker & Son has collaborated with reached out to us with a special interior demolition opportunity in South Jersey. The project held sentimental value for her as it involved...