Scheduling For Dust, Noise and Vibration During a Demolition Project

 

Demolition is usually the first phase of a renovation project, and it requires careful planning and a highly experienced contractor. But even though it is very important to the entire project schedule to complete the demolition phase on time, design drawings are often lacking in detail, and means and methods are left to the demolition contractor.

Demolition timing and logistics must be carefully coordinated with owners and facility managers to make sure that business operations and production continue smoothly, with no disruption.  R. Baker & Son has extensive experience filling in the fine details required to complete this phase swiftly, safely, and efficiently.

Dust, noise, and vibration are often major concerns and must be addressed in detail.  Dust can be alleviated by wetting surfaces, capturing particles with fog or spray, or using exhaust systems.  Noise and vibration are largely inevitable byproducts that can be annoying to workers and disruptive to productivity, so it is important to work closely with owners to carefully schedule tasks that will create dust, noise, vibration, or any combination of the three.  For example, a job requiring the use of jackhammers can be scheduled on a particular day from 6 to 8 a.m., noon to 1 p.m., and 4 to 6 p.m.  This allows management to plan ahead and work around these conditions without any surprises or unexpected disruptions.

A Rigging and Routing Plan is another important part of the demolition phase of a project.

R. Baker & Son is familiar with the many complexities involved in moving large pieces of equipment such as lyophilizers, air handling units, isolators and boilers.  Careful planning is required to determine when and how to move these items, and through what access points, and
rigging is coordinated to occur during convenient off hours when personnel safety won’t be compromised. 

R. Baker & Son has countless successful demolition projects under our belts and can provide clients with demolition schedules and Rigging & Routing Plans that address all project concerns and details.  Please contact us if we can help with your next project.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico. The Service-Disabled Veteran-Owned Small Business (SDVOSB) has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million). Capabilities include industrial and commercial demolition, rigging, machinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com

 

Full News Archive

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Demolition Project - Radio Communication in Construction
Proper Radio Communication on Construction Sites

Communication is key, is a popular saying that is especially fitting on a construction, rigging, or demolition job-site. Radio communication is an important tool that helps team members work more...
Demolition, Selective Demolition, Interior Demolition
Demolition and Closing the Gap

Oftentimes during selective demolition or interior demolition activities, opening up walls, ceilings, floors, shafts and pits can expose a plethora of structural problems, code issues, and other...
Rigging - Process Equipment
Rigging and Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...
Interior Demolition Contractor in the North East
Quick Mobilization on Interior Demolition Project

Late last spring, construction was about to get underway on a large new warehouse in upstate New York when the construction management firm called R. Baker & Son with an urgent request. The...
interior demolition, mechanical contractor, installing prefabricated skids
Rigging Prefab in Sequence

At the completion of the interior demolition phase of a large renovation project, the mechanical contractor approached R. Baker & Son to request their assistance with rigging and installing...
Green Roof Installation - R. Baker & Son Environmental Services
Rigging Team Assists in Green Roof Installation

After a new office building construction project in western-central New Jersey where R. Baker & Son had been rigging architectural features in the expansive atrium, the construction manager asked...
Demolition Day T-Shirt, R. Baker Demolition
Everyone Loves Demolition Day!

Back in the mid-1940s, the demolition wrecking ball was a unique new demolition tool. A massive heavy steel ball swung by a very skillful operator in a large crane. By carefully moving the crane and...
Logistics are vital to plant relocation project
Successful Plant Relocation

Relocating a plant is a highly demanding task, but a large portion of the work happens in the planning.Plant relocation projects must be handled through a master plan with multiple phases and...