What is a Critical Lift?

Image of Critical Lifting

In the crane and rigging industry, a critical lift is a rigging activity in which a comprehensive plan is necessary to minimize risk of crane failure or catastrophic loss. As for the term “critical lift”, though there is no universally-accepted single definition or industry standard used for categorization, there are a number of items that are common to various agencies and rigging industry associations. OSHA characterizes the definition thusly: a critical lift is one that a) exceeds 75% of the rated capacity of the crane or derrick, or b) requires the use of more than one crane or derrick. Various other government agencies and industry associations such as NIOSH, the US Army Corps of Engineers, and the Department of Energy use their own criteria to classify a critical lift that will require development of a critical lift plan.  Following are some of the most commonly-appearing elements of a critical lift (keeping in mind that specific projects have unique conditions that should be taken into consideration): 

  • Any lift that requires more than one crane 

  • Loads exceeding 75% of a crane’s rated capacity

  • Lifting of personnel

  • Load suspension above rigging personnel

  • Loads not in view of the crane operator

  • Loads of exceptional value

  • Loads that have the potential for becoming unstable during rigging

If it is determined that a lift is to be considered critical, a detailed critical lift plan must be prepared. Following an analysis by qualified rigging personnel, a critical lift plan should include details such as size and weight of the load, equipment needed, boom length and angle, crane and boom positioning, required personnel, crane capacity, sequencing, and environmental conditions, among others.  The critical lift plan should be thoroughly reviewed with the rigging crew prior to the lift to ensure that all necessary details and required safety procedures are in place. 

R. Baker & Son, a leading rigging contractor since 1936, has conducted countless critical lifts for a vast array of clients in a variety of industries throughout the U.S., Canada and Puerto Rico. We are staffed by experienced master riggers, engineers, and skilled rigging tradespersons and equipped with all of the necessary equipment to handle even the most complex rigging projects with the highest safety standards.  

Full News Archive

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Data Center Floor - Selective Demolition
Fortune 100 Selective Demolition

R. Baker & Son was recently challenged with performing selective demolition of a large building that housed a critical data center. The renovation project for a New Jersey-based Fortune 100...
Fork Lift Recovering Assets for Contractor
IRAs Seven Rs for Asset Recovery

R. Baker & Son is a member of the Investment Recovery Association (IRA), the premier resource for companies and individuals engaged in the management and recovery of surplus and idle assets. The...
Green House Demolition
Demolition: What's Your Approach?

When it comes to defining a construction project’s approach, most good project management teams can produce a plan that methodically lays out phases, tasks and timelines in meticulous detail....
Safety earbuds or earplugs for protection from hearing loss
Hazardous Noise in Rigging and Demolition

Each year, 30 million people in the U.S. are exposed to hazardous noise in the workplace, and about 20,000 of them suffer cumulative and irreversible hearing loss that neither surgery nor a hearing...
Kosciuszko Bridge NYC
NYCs Busy Kosciuszko Bridge to be Imploded Summer 2017

The 78 year-old Kosciuszko Bridge connecting Greenpoint, Brooklyn to Maspeth, Queens is being replaced with two new spans slated for completion in 2020. New York State Governor Andrew Cuomo announced...
Rigging Near Overhead Powerlines
Rigging Near Overhead Powerlines

Crane operation near overhead power lines is one of the most dangerous jobs a rigging crew can undertake. In fact, electrocution is the number one cause of crane-related fatalities, making compliance...
Compact Boom Lifts Fit Through Standard Doorways
Compact Boom Lifts Fit Through Standard Doorways

R. Baker & Son occasionally encounters a situation on an interior rigging project in which a boom lift is needed to perform the job, but access is limited by narrow entryways, gates and hallways....
Rigging of Modular Prefab Pharmaceutical Plants
Rigging of Modular Prefab Pharmaceutical Plants

Installation of prefabricated modules is becoming increasingly common in the pharmaceutical industry. R. Baker & Son has been instrumental in offloading, rigging, setting in place and connecting...