Utility Safety During Demolition

Demolition in New Jersey requires considerable planning when it comes to utilities. Before R. Baker & Son begins a project, multiple above-ground and below-ground utilities must be considered and identified, and may need to be shut off, disconnected, and/or relocated in order to perform demolition.

Prior to starting demolition, each utility company must be contacted. Local representatives or field engineers will be assigned to the project and may require submission of drawings, applications, and/or permits pertaining to the individual utilities. For example, electrical lines will need to be shut down, relocated, tested, and reenergized under the supervision of the electric company, who may also need to notify nearby customers of power interruptions. Similarly, water lines may require that valves be shut down and verified that they hold, and pressure taken off the line and locked out for worker safety. Gas lines may need to be shut down, pressure relieved and purged of all residual gas, and verified before work can commence.

Fiber optic cables and cable TV also require coordination with the utility companies. Fiber optic cables carry significant amount of data, and a severed line can affect service to thousands of commercial and residential customers. Damage to TV cables can cause outages for numerous customers as well.

Utility representatives will mark where underground utilities are located with paint and flags to prevent accidents and unnecessary interruptions. The most common method for locating utilities is using a tick tracer or sensitive metal detectors to locate piping or electrical lines.

Though drawings and as-builts are valuable aids in locating utilities, it should be noted that there may be inaccuracies, and sometimes these drawings have been misplaced and can’t be located. Also, easements that give utilities a right of way to exist are often unmarked, and as NJ is the most densely populated state, there is an increased chance of accidental damage to utilities.

Lastly, when removing utilities during demolition, it is important to preserve all meters and return them to the utility company. For more information on utilities during demolition, please contact R. Baker & Son at 732-222-3553.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a  Service-Disabled Veteran-Owned Small Business (SDVOSB)  in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Facebook:  https://www.facebook.com/Demolition.Rigging

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Demolition Project Goes Underground
Demolition Project Goes Underground

A 175,000 square-foot OTC R&D and production building, constructed in the early 1960s, was undergoing complete interior demolition to be repurposed as a pilot facility. The demolition schedule...
Copper Recycling Offsets Dismantling Project Costs
Copper Recycling Offsets Dismantling Project Costs

A large electrical-mechanical contractor hired R. Baker & Son to perform all of the electrical equipment dismantling and mechanical equipment removal at an old vitamin production facility...
CUP Multi-Phase Selective Demolition Project: Demo by Color
CUP Multi-Phase Selective Demolition Project: Demo by Color

An aging central utility plant serving a large northern New Jersey hospital was due for complete renovation, including the replacement of almost all equipment including boilers, chillers, cooling...
Rigging Safety Guidelines - Industrial Services
Rigging Safety Guidelines

Safety is paramount at R. Baker & Son, which is why we strictly observe all rigging safety regulations, guidelines and procedures on every lift we do. Guidelines for rigging safety: Inspect...
R. Baker Salvages Fixtures for Reuse on Plant Consolidation Project
R. Baker Salvages Fixtures for Reuse on Plant Consolidation

A longtime client approached R. Baker & Son with a plant relocation project in which operations at several partially-occupied buildings were to be moved to a single 200,000 sq. ft. building...
Planning for Rigging & Demo Projects
Safety Planning for Rigging and Demolition Projects

When performing a rigging or demolition project, falling materials, fall hazards, unstable structures, and a variety of other hazards can pose serious risks to both workers and the general public, so...
Rigging Process Equipment Narrow Shaft
Rigging Process Equipment Narrow Shaft

An old R&D facility in Northern New Jersey needed to renovate an area to make way for an important new expansion. Because real estate for needed process equipment was limited, the only area...
Demolition Equipment Maintenance
Demolition Equipment Maintenance SOP