Pre-Project Rigging and Demolition Safety Measures

Pre-Project Rigging and Demolition Safety Measures

When performing a rigging or demolition project, falling materials, fall hazards, unstable structures, and a variety of other hazards can pose serious risks to both workers and the general public, so it is important that the worksite is properly secured before work can begin. R. Baker & Son takes numerous safety measures and follows all regulations to prevent accidents and injuries on every rigging and demolition project.

To prevent people from entering a worksite, whether inadvertently or purposely, a fence should be erected, making sure that emergency vehicles can easily gain access if necessary. Danger signs should be posted around the perimeter warning that demolition or rigging work is in progress. The worksite should be inspected for areas that pose a risk of falling. Floor and wall openings should be boarded or otherwise covered and steps should be taken to prevent accidental removal of the materials. Walkways and stairs should be inspected for safety and proper illumination.

Prior to demolition work, an engineering survey must be conducted per OSHA requirement. Structures where demolition or rigging crews will be working should be checked and monitored for weak areas and braced where necessary. Before positioning a crane, ensure that the ground is stable and that there is adequate space to accommodate the crane, outriggers, and the load. Workers should be properly fitted with personal protective equipment such as hardhats, eye protection, gloves, and fall protection. Set up chutes and containers for debris disposal. Turn off utilities prior to commencing demolition or rigging work, and notify utility companies of the project.

Emergency medical information listing nearby hospitals, clinics and doctors, as well telephone numbers for emergency services, should be posted before commencing demolition or rigging work. Type III first aid kits must be made readily available. Minimize fire risks and create a fire plan, and post evacuation routes.

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Web: http://www.rbaker.com/
Facebook: http://rbaker.com/rigging-contractors.php

 

Full News Archive

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Kosciuszko Bridge NYC
NYCs Busy Kosciuszko Bridge to be Imploded Summer 2017

The 78 year-old Kosciuszko Bridge connecting Greenpoint, Brooklyn to Maspeth, Queens is being replaced with two new spans slated for completion in 2020. New York State Governor Andrew Cuomo announced...
Image of Critical Lifting
What is a Critical Lift?

In the crane and rigging industry, a critical lift is a rigging activity in which a comprehensive plan is necessary to minimize risk of crane failure or catastrophic loss. As for the term...
Rigging Near Overhead Powerlines
Rigging Near Overhead Powerlines

Crane operation near overhead power lines is one of the most dangerous jobs a rigging crew can undertake. In fact, electrocution is the number one cause of crane-related fatalities, making compliance...
Compact Boom Lifts Fit Through Standard Doorways
Compact Boom Lifts Fit Through Standard Doorways

R. Baker & Son occasionally encounters a situation on an interior rigging project in which a boom lift is needed to perform the job, but access is limited by narrow entryways, gates and hallways....
Rigging of Modular Prefab Pharmaceutical Plants
Rigging of Modular Prefab Pharmaceutical Plants

Installation of prefabricated modules is becoming increasingly common in the pharmaceutical industry. R. Baker & Son has been instrumental in offloading, rigging, setting in place and connecting...
Dismantling Clean and Green
Dismantling Clean and Green

Dismantling projects pose distinctly different sets of challenges depending on the industry. On pharmaceuticals projects, biological and chemical contaminants must be eliminated before dismantling...
Hydraulics: The Force Behind Rigging & Demolition
Hydraulics: The Force Behind Rigging & Demolition

Hydraulics is the workhorse of modern rigging and demolition, providing the muscles that lift, steer and drive the cranes, excavators, breakers, and hammers used each day. But hydraulics is not a...
Surgical Industrial Dismantling
Surgical Industrial Dismantling

Critical dismantling and demolition projects, such as medical facilities, pharmaceutical plants, data centers, advanced manufacturing, etc., require enabling work for the project to move forward....