The Demolition Environment

The Demolition Environment

Having the proper lighting and ventilation throughout a demolition project is important to ensure safe conditions for workers and site personnel. Though often overlooked by other demolition contractors, R. Baker & Son develops and implements lighting and ventilation plans on every project we do.

Low lighting levels can a pose a significant hazard on a demolition project and can be directly connect with increased injury. Years ago, worksite lighting typically consisted of 100W incandescent lightbulbs spaced forty to fifty feet apart on stringers, and bulbs that burned out often went unchanged. Nowadays, a demolition contractor should provide sufficient lighting with high-output mercury vapor, LED, or quartz lighting with protective cages. Lighting should be at least 3W per square foot, though some areas may require more. Shafts, pits, and other dark pockets require their own lighting, rather than depending on general area lighting to illuminate them. Demolition lighting requires constant vigilance in that lighting and lighting circuits must be relocated as work progresses to keep lighting levels sufficient and fixtures in good working order for the duration of the project.

Dirt, dust, and other particulates are an inherent part of every demolition project. Ventilation can be handled either by using the existing HVAC system, or by bringing in temporary ventilation in the form of sufficiently-sized exhaust fans. Like lighting, ventilation requires constant attention to ensure that filters are clean and equipment is running and performing properly. There should be several air changes per hour at minimum, which can be determined easily by calculating the total volume of the space, but more may be required depending on the task at hand. In demolition areas adjacent to clean spaces, a flow indicator or magnehelic gauge should be used to ensure that dust does not escape.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
http://www.rbaker.com

Full News Archive

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Ground-Penetrating Radar (GPR)
Ground-Penetrating Radar (GPR) and Demolition

R. Baker & Son recently performed selective demolition at a renovation project at a pharmaceutical plant. One of the Baker Team’s challenges was to make way for new laboratory exhaust...
Demolition contractor doing environmental cleanup
Environmental Cleanup

A lot of people may not associate demolition and rigging with environmental cleanup, but contractors like R. Baker & Son play a big part on many fronts. Rigging and demolition contractors remove...
Carbon filter used on demolition work
Dust, Noise, Vibration and Odor

R. Baker & Son worked closely with the owner of a large three-story building during a recent interior demolition project to develop a dust, noise and vibration schedule. Occupied office buildings...
Building coming down, after series of explosions
Demolition by Implosion

Demolition by implosion, in which explosives are used to make a building collapse down into its footprint, can be an impressive sight to see. Huge buildings, arenas, bridges and other structures that...
Data Center Floor - Selective Demolition
Fortune 100 Selective Demolition

R. Baker & Son was recently challenged with performing selective demolition of a large building that housed a critical data center. The renovation project for a New Jersey-based Fortune 100...
Fork Lift Recovering Assets for Contractor
IRAs Seven Rs for Asset Recovery

R. Baker & Son is a member of the Investment Recovery Association (IRA), the premier resource for companies and individuals engaged in the management and recovery of surplus and idle assets. The...
Green House Demolition
Demolition: What's Your Approach?

When it comes to defining a construction project’s approach, most good project management teams can produce a plan that methodically lays out phases, tasks and timelines in meticulous detail....
Safety earbuds or earplugs for protection from hearing loss
Hazardous Noise in Rigging and Demolition

Each year, 30 million people in the U.S. are exposed to hazardous noise in the workplace, and about 20,000 of them suffer cumulative and irreversible hearing loss that neither surgery nor a hearing...