Rigging Inspection

Rigging Inspection
They say a chain is only as strong as its weakest link, which is exactly the case with rigging equipment. Crane hooks, slings, shackles, and spreader bars are all single points of failure, meaning one small failure of one piece of hardware can be catastrophic. OSHA part number 1910.179 A1 and 1910.179 A3 define different types of cranes, of which there are many. OSHA permits only trained, qualified employees to use this equipment and requires its inspection under 1910.184.

The key to rigging safety is identifying hazards, being knowledgeable about rigging, knowing the equipment and hardware you will be rigging with, having a pick plan, and inspecting all equipment that will be used thoroughly and completely. OSHA has very detailed rules governing the selection and use of cranes and slings stated in 29 CFR 1910.179, 180, and 184. OSHA is very specific about what equipment must be inspected daily, and what may require periodic inspection to prevent accidents with cranes, slings, and other rigging hardware.

Crane hooks, shackles, chain hoist, spreaders and other rigging equipment must be thoroughly inspected for wear and unusual wear, bending or twisting of the metal, chips or dents stress fractures or cracks. Anything that does not look new or in new condition should not be used. If there is any question to the integrity of any hardware, it must be set aside for further detailed inspection and replaced with new equipment if necessary. All new equipment must also be inspected before use. All cranes and rigging equipment are rated for capacity, and the rated capacity should never be exceeded. A good work practice is to avoid exceeding 75% of rated capacity for slings shackles, crane hooks, spreader bars and the like.

R. Baker & Son - All Industrial Services
1 Globe Court
Red Bank, NJ 07701
732-222-3553
http://www.rbaker.com

Full News Archive

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Interior Demolition - Wet Saw
Interior Demo: Mid-Project Changes Save Time and Money

Discovering an opportunity for substantial cost savings during a project in progress is always a welcome surprise, which was the case on a warehouse renovation in which R. Baker & Son was tasked...
Safety Plan, Demolition and Rigging Contractor
Site-Specific Safety Plan

A site-specific safety plan (SSSP) is an agreement that addresses project-specific safety concerns and challenges and how to manage them. It serves as a communication tool between involved...
Preventing, Recognizing, and Treating Heat Related Illness
R. Baker Workers Trained In Heat Related Illness

With summer only just begun, there are likely many hot days ahead. In construction, demolition, and rigging, heat-related illness is a very real threat if the proper steps are not taken to prevent...
Tank Rigging Project - All Industrial Services
Tank Rigging Project

A large food processing plant was referred to R. Baker & Son to take on the task of rigging all new equipment into an existing 200,000 sq. ft. facility. The majority of equipment consisted of...
Skid Steer Loader - Demolition Contractor
The Skid Steer Loader, Workhorse of the Demolition Industry

One of the most versatile machines on any construction or demolition project is the skid steer loader, a compact, rigid-framed, engine-powered machine with lift arms that can be fitted with a variety...
Rigging Tanks In Pharmaceutical Plant
Baker Handles Pharma Rigging Project with TLC

R. Baker & Son was challenged with a unique rigging project for a pharmaceutical client in northern New Jersey.The scope of work called for removal of numerous pieces of process equipment...
Clean Air, Demolition Project
Innovative Approach to Clean Air on Demo Project

A good demolition plan often takes a holistic approach to achieve common project goals. The return on investment is almost always well worth it. R. Baker & Son was challenged to perform a...
Demolition Project - Radio Communication in Construction
Proper Radio Communication on Construction Sites

Communication is key, is a popular saying that is especially fitting on a construction, rigging, or demolition job-site. Radio communication is an important tool that helps team members work more...