asset recovery, rigging team with sling and interior demolition

Clean Construction Projects

Clean Construction Projects

 

Keeping a construction jobsite clean of dust, dirt, and debris plays a large part in delivering a successful finished product, and contractors should develop and adhere to a detailed environmental plan on every project.  Strict cleanliness is particularly important in operating facilities where personnel are present in adjacent areas, which is frequently the case on selective demolition, plant relocation, interior demolition, and equipment relocation and dismantling projects.  

 

Plastic dust barriers can be used to enclose a workspace to contain dust and debris and prevent it from escaping into clean areas.  HEPA air cleaners can be used to contain or filter construction dust, and filters can also be installed on outside air handling units.  To capture particles from footwear, adhesive mats may be placed at work area entrances and exits, or stations can be set up for workers to put on shoe covers and Tyvek suits. When work in a particular section has been completed, signs and barriers can be used to route workers around the area.  Washdown and wipedown stations may be set up to remove dirt and contaminants from equipment before it is moved through clean areas.  Crews should perform thorough cleanup of the work area on a daily basis at minimum.  Surfaces should be wiped down, floors, stairs, wall cavities, etc., can be cleaned with a HEPA vacuum, sweeper or scrubber.  

 

R. Baker & Son provides clients with a comprehensive, strictly-enforced Environmental Plan on each project to sustain an immaculate jobsite that can pass a white-glove test upon completion with flying colors, and ensure that adjoining spaces remain free of dust, dirt and contamination. We also work closely with owners to develop a schedule to minimize dust, noise and vibration while building occupants are present.

 

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services, a Service-Disabled Veteran-Owned Small Business (SDVOSB) in business since 1935, is a premier specialized contractor operating in the United States, Canada and Puerto Rico, with over one hundred employees and an exemplary safety record (we have been directly involved in four sites that received VPP OSHA Safety Awards). R. Baker & Son is financially strong, with bonding capabilities over $10 million. Capabilities include industrial and commercial demolition, rigging, machinery- and plant-moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, selective demolition, warehousing, wrecking and razing, millwright, plant reconfigurations, heavy rigging, salvage, environmental services, remediation, decontamination, abatement, and investment and asset recovery.. 

Demolition, wrecking and razing, rigging, millwright, plant reconfigurations, heavy rigging, Service-Disabled Veteran-Owned Small Business / SDVOSB, salvage, dismantling, decommissioning, plant and machinery moving, building demolition, riggers, environmental services, remediation, decontamination, abatement, interior demolition, investment and asset recovery.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311

Facebook: https://www.facebook.com/Demolition.Rigging

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Demolition Project Goes Underground
Demolition Project Goes Underground

A 175,000 square-foot OTC R&D and production building, constructed in the early 1960s, was undergoing complete interior demolition to be repurposed as a pilot facility. The demolition schedule...
Copper Recycling Offsets Dismantling Project Costs
Copper Recycling Offsets Dismantling Project Costs

A large electrical-mechanical contractor hired R. Baker & Son to perform all of the electrical equipment dismantling and mechanical equipment removal at an old vitamin production facility...
CUP Multi-Phase Selective Demolition Project: Demo by Color
CUP Multi-Phase Selective Demolition Project: Demo by Color

An aging central utility plant serving a large northern New Jersey hospital was due for complete renovation, including the replacement of almost all equipment including boilers, chillers, cooling...
Rigging Safety Guidelines - Industrial Services
Rigging Safety Guidelines

Safety is paramount at R. Baker & Son, which is why we strictly observe all rigging safety regulations, guidelines and procedures on every lift we do. Guidelines for rigging safety: Inspect...
R. Baker Salvages Fixtures for Reuse on Plant Consolidation Project
R. Baker Salvages Fixtures for Reuse on Plant Consolidation

A longtime client approached R. Baker & Son with a plant relocation project in which operations at several partially-occupied buildings were to be moved to a single 200,000 sq. ft. building...
Planning for Rigging & Demo Projects
Safety Planning for Rigging and Demolition Projects

When performing a rigging or demolition project, falling materials, fall hazards, unstable structures, and a variety of other hazards can pose serious risks to both workers and the general public, so...
Rigging Process Equipment Narrow Shaft
Rigging Process Equipment Narrow Shaft

An old R&D facility in Northern New Jersey needed to renovate an area to make way for an important new expansion. Because real estate for needed process equipment was limited, the only area...
Demolition Equipment Maintenance
Demolition Equipment Maintenance SOP