R. Baker & Son Completes Critical Installation of Generator for Private Client

R. Baker and Son All Industrial Services, an expert rigging, machinery moving and equipment relocation contractor recently completed the rigging and rough setting of a 4,000 lb backup generator for a private client in New Jersey.

R. Baker & Son All Industrial Services (R. Baker & Son) was contracted by a private client to offload, rig and set a 4,000 lb generator onto a concrete pad.  The client contracted R. Baker & Son to perform the work due to their impeccable safety record (EMR 0.79), professionalism and cost effectiveness.

Prior to the commencement of work, R. Baker & Son conducted several evaluations and the development of a critical lift plan.  An evaluation of the area where the crane and equipment would be placed was conducted to ascertain ground stability and the potential for underground utilities.  The weight of the generator was also considered to determine proper selection of necessary slings and associated rigging equipment.  Based on the weight of the generator and the calculation of height and radius from center pin of crane to desired placement of generator, R. Baker & Son determined that the appropriate sized crane needed to be a 50 ton hydraulic crane

The work began by coordinating the delivery of the generator to the site with the mobilization of the crane and rigging crew.  The project needed to be completed in one day so timing was crucial.

R. Baker & Son mobilized a three (3) man expert rigging crew along with a 50 ton hydraulic crane to the site.  In addition, ancillary rigging equipment (shackles, nylon straps, etc.) and safety equipment (fire extinguishers, safety kit, etc.) were also delivered to the site.

The flat bed truck delivering the generator and the rigging crew along with crane were expertly coordinated to the site and all arrived on time in the morning.  The generator was then carefully lifted from the flatbed and then carefully placed onto the concrete pad.  The generator was rough set.

The project was completed within the 1 day timeframe set by the client.  The project was incident and accident free.  For more information on R. Baker & Son’s capabilities and projects completed, please visit http://www.rbaker.com

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico.  The veteran founded company has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million).  Capabilities include industrial and commercial demolition, riggingmachinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

Contact Information

R. Baker & Son All Industrial Services
1 Globe Court
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: http://www.rbaker.com
Email: marketing@rbaker.com
 

Full News Archive

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Interior Demolition - Wet Saw
Interior Demo: Mid-Project Changes Save Time and Money

Discovering an opportunity for substantial cost savings during a project in progress is always a welcome surprise, which was the case on a warehouse renovation in which R. Baker & Son was tasked...
Safety Plan, Demolition and Rigging Contractor
Site-Specific Safety Plan

A site-specific safety plan (SSSP) is an agreement that addresses project-specific safety concerns and challenges and how to manage them. It serves as a communication tool between involved...
Preventing, Recognizing, and Treating Heat Related Illness
R. Baker Workers Trained In Heat Related Illness

With summer only just begun, there are likely many hot days ahead. In construction, demolition, and rigging, heat-related illness is a very real threat if the proper steps are not taken to prevent...
Tank Rigging Project - All Industrial Services
Tank Rigging Project

A large food processing plant was referred to R. Baker & Son to take on the task of rigging all new equipment into an existing 200,000 sq. ft. facility. The majority of equipment consisted of...
Skid Steer Loader - Demolition Contractor
The Skid Steer Loader, Workhorse of the Demolition Industry

One of the most versatile machines on any construction or demolition project is the skid steer loader, a compact, rigid-framed, engine-powered machine with lift arms that can be fitted with a variety...
Rigging Tanks In Pharmaceutical Plant
Baker Handles Pharma Rigging Project with TLC

R. Baker & Son was challenged with a unique rigging project for a pharmaceutical client in northern New Jersey.The scope of work called for removal of numerous pieces of process equipment...
Clean Air, Demolition Project
Innovative Approach to Clean Air on Demo Project

A good demolition plan often takes a holistic approach to achieve common project goals. The return on investment is almost always well worth it. R. Baker & Son was challenged to perform a...
Demolition Project - Radio Communication in Construction
Proper Radio Communication on Construction Sites

Communication is key, is a popular saying that is especially fitting on a construction, rigging, or demolition job-site. Radio communication is an important tool that helps team members work more...