Scheduling For Dust, Noise and Vibration During a Demolition Project

Scheduling For Dust, Noise and Vibration During a Demolition Project

 

Demolition is usually the first phase of a renovation project, and it requires careful planning and a highly experienced contractor. But even though it is very important to the entire project schedule to complete the demolition phase on time, design drawings are often lacking in detail, and means and methods are left to the demolition contractor.

Demolition timing and logistics must be carefully coordinated with owners and facility managers to make sure that business operations and production continue smoothly, with no disruption.  R. Baker & Son has extensive experience filling in the fine details required to complete this phase swiftly, safely, and efficiently.

Dust, noise, and vibration are often major concerns and must be addressed in detail.  Dust can be alleviated by wetting surfaces, capturing particles with fog or spray, or using exhaust systems.  Noise and vibration are largely inevitable byproducts that can be annoying to workers and disruptive to productivity, so it is important to work closely with owners to carefully schedule tasks that will create dust, noise, vibration, or any combination of the three.  For example, a job requiring the use of jackhammers can be scheduled on a particular day from 6 to 8 a.m., noon to 1 p.m., and 4 to 6 p.m.  This allows management to plan ahead and work around these conditions without any surprises or unexpected disruptions.

A Rigging and Routing Plan is another important part of the demolition phase of a project.

R. Baker & Son is familiar with the many complexities involved in moving large pieces of equipment such as lyophilizers, air handling units, isolators and boilers.  Careful planning is required to determine when and how to move these items, and through what access points, and
rigging is coordinated to occur during convenient off hours when personnel safety won’t be compromised. 

R. Baker & Son has countless successful demolition projects under our belts and can provide clients with demolition schedules and Rigging & Routing Plans that address all project concerns and details.  Please contact us if we can help with your next project.

About R. Baker & Son All Industrial Services

R. Baker & Son All Industrial Services is the premier specialized contractor in the United States, Canada and Puerto Rico. The Service-Disabled Veteran-Owned Small Business (SDVOSB) has been in business since 1935, has over 100 employees, an exemplary safety record (We have been directly involved in four (4) sites that received VPP OSHA Safety Awards) and is financially strong (bonding capabilities over $10 Million). Capabilities include industrial and commercial demolition, rigging, machinery & plant moving, dismantling, decommissioning, plant and equipment relocation, interior demolition, wrecking, selective demolition , demolition contractors in NJ and warehousing.

R. Baker & Son All Industrial Services
1 Globe Street
Red Bank, NJ 07701
Phone: 732-222-3553
Fax: 732-450-0311
Website: www.rbaker.com

For more information visit our website or contact Damon Kozul, PE, CHMM at dkozul@rbaker.com

 

Full News Archive

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

CPR and First Aid Training Class @ R.Baker & Son
Why CPR and First Aid Training is Critical in Construction

There is no question that having employees who are trained in CPR and first aid has many benefits, first and foremost the fact that it saves lives. But CPR and first aid training can be particularly...
University Hospital NY - Renovation Project
Hospital Renovation Project

A large university hospital in New York had several buildings on campus. The central building, a 75,000 sq. ft. four-story structure with a mechanical penthouse was the first to be erected in 1944,...
Demolition Contractor: Earning & Keeping Our Reputation
Demolition Contractor: Earning and Keeping Our Great Reputation

A demolition contractor’s reputation is everything, and what can take decades to build can be lost very quickly if great care is not taken. Customers have specific overall expectations, most...
Rigging Setting the Final Pieces of Process Equipment
Rigging Setting the Final Pieces of Process Equipment

A large, ongoing pharmaceutical project was facing a dilemma. With most work progressing smoothly and on-schedule, equipment for one very important process area would not be arriving onsite until the...
Demolition Project Goes Underground
Demolition Project Goes Underground

A 175,000 square-foot OTC R&D and production building, constructed in the early 1960s, was undergoing complete interior demolition to be repurposed as a pilot facility. The demolition schedule...
Copper Recycling Offsets Dismantling Project Costs
Copper Recycling Offsets Dismantling Project Costs

A large electrical-mechanical contractor hired R. Baker & Son to perform all of the electrical equipment dismantling and mechanical equipment removal at an old vitamin production facility...
CUP Multi-Phase Selective Demolition Project: Demo by Color
CUP Multi-Phase Selective Demolition Project: Demo by Color

An aging central utility plant serving a large northern New Jersey hospital was due for complete renovation, including the replacement of almost all equipment including boilers, chillers, cooling...
Rigging Safety Guidelines - Industrial Services
Rigging Safety Guidelines

Safety is paramount at R. Baker & Son, which is why we strictly observe all rigging safety regulations, guidelines and procedures on every lift we do. Guidelines for rigging safety: Inspect...