Substation and Mechanical Selective Demolition

A new pharmaceutical company took over an existing North Jersey facility with plans for major demolition and renovation. Design work began immediately, and long-lead equipment was ordered early on. To meet the aggressive schedule, a parallel selective demolition plan was developed by R. Baker & Son in anticipation of the arrival of the new equipment. 

Plans called for a new, larger electrical service requiring removal of an existing substation and installation of a new one. Two existing 600 HP boilers were slated for removal to make way for eight smaller high-efficiency boilers. Four 75-ton chillers, only five years old, were to remain, but aged 100% outside air handlers and associated piping were to be replaced by new recirculating units and required demolition. Because the facility was to be operational for the duration of the project, however, it was necessary for utilities and HVAC systems remain in place until new equipment arrived, at which point R. Baker & Son’s portion of the project would need to move forward swiftly. This required a close team effort between the Baker team, electrical and mechanical contractors, and the owner.  

The first, and most critical, swap-out was the removal of a 1500 kVA single-ended substation and installation of a 2500 kVA double-ended substation on a newly-enlarged concrete pad. After weeks of planning and preparation, the electrical shutdown began on a Friday night.  Following all lockout-tagout procedures, the equipment removal proceeded through the weekend. The new substation was rigged in place on Monday morning, and reconnection began immediately, with a one-week timeframe to get the power back on. 

Over the next several consecutive Fridays, R. Baker & Son removed the two existing boilers so the eight smaller boilers could be rigged, set, installed in place, and readied for piping. Finally, the air handlers were removed in a set sequence to keep the cooling system running while the new units were installed.  The Baker team performed asset recovery of the boilers and substations for resale allowed the owner to recoup their value and reduce the overall cost of the project.

R. Baker & Son - All Industrial Services
190 Boundary Road
Marlboro, NJ 07746
732-222-3553
http://rbaker.com/selective-demolition.php

Full News Archive

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008

Recent News

Construction Crane NYC
Counting Cranes to Forecast Construction Growth

Cranes are a familiar sight in New York City and other urban areas, and people who depend on the construction industry for our livelihoods, like those of us at R. Baker & Son, tend to be...
Demolition Contractor in NJ
Demo Protection

Some interior or select demolition projects are complete guts or tear outs where everything must go. Some items need to be identified as not to demolish and remove; this can be done with marking with...
R. Baker Plant Relocation Photo
Plant Relocation Specialists

Relocating a plant can be a complex undertaking, one that requires close coordination, meticulous planning, and good communication among contractors, owners, designers, and facility personnel. A...
Baker Works w/ MEP Engineers to Accelerate Plant Relocation
Baker Works w/ MEP Engineers to Accelerate Plant Relocation

Relocating a plant, whether moving across town or across the country, usually means there will be a lapse in production. The longer process is down, the higher the cost, which is why bringing the new...
Fire Protection - Fire Alarms, in Building Demolition
Fire Protection Requirements in Demolition

Demolition in existing buildings and structures that are attached to or near other structures requires coordination with the client, insurance company, or local jurisdiction to review building safety...
Industrial crane boom hoisting up a suspended load by cables
Rigging Equipment - Plan of Control

In both rigging and demolition equipment is what gets the job done. However, it is intelligent, experienced people that decide on the approach of how things get done and in what progression, which...
Confined Space Warning Sign
Confined Space Construction Rule

OSHA’s definition of a confined space is an area that is large enough for a worker to enter that has limited or restricted means for entry or exit and was not designed for continuous occupancy....
scrap metal at demolition site
Scrap Metal Prices Are On The Rise

It’s demolition time - scrap metal prices are way up and demolition costs have expectantly come down. There has never been a better time for you to get that demolition project out of the drawer...